BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work and new construction of an educational facility in Arlington, Massachusetts. Completed plans call for the demolition of a educational facility; for the construction of a 408,590-square-foot educational facility; and for site work for a educational facility.

Shortlist confirmed Request for Qualifications (RFQ) for Trade Contractors for the new Arlington High School Project. Construction of a a new 408,590 sq. ft. High School building and phased demolition of the existing facility located. The SOQ is for the following trades: (a) Masonry; (b) Miscellaneous and Ornamental Metals; (c) Waterproofing; (d) Roofing & Flashing; (e) Metal Windows; (f) Glass & Glazing; (g) Tile; (h) Acoustic Tile; (i) Resilient Flooring; (j) Painting; (k) Fire Protection; (l) Plumbing; (m) HVAC; (n) Electrical; and (o) Terrazzo. This is a CM at Risk Project under M.G.L. c. 149A. Interested firms must submit a Statement of Qualifications (SOQ) by the deadline and be pre-qualified if they are interested in later bidding on this project. The RFQ contains specific criteria for trade contractor prequalification and selection. This RFQ is part of a two-step selection process for the Trade Contractors. First, interested firms must submit the SOQ and then, at a later date, only the pre-qualified firms will be invited to bid on the category of work for which they were pre-qualified. All firms must be pre-qualified for this Project even if they are already DCAM Certified. The CM is Consigli Construction CO., the OPM is Skanska, and the architect is HMFH Architects. The project will be completed in 4 phases. The high school will be completed in 3 phases and the 4 th phase will be demolishing the remaining building and site work. Phase 1 construction (on the green space in front of the existing high school) will include the three-story Auditorium wing, the four-story STEAM wing, and a portion of the spine to the south of the STEAM wing west stair. Phase 2 construction will include the five story Humanities classroom wing, the three-story preschool/classroom/office wing to the east of the classroom wing, and the balance of the public spine. Buildings in this phase will be constructed on the current site of the existing high school's Collomb House and Auditorium. Phase 3 construction will include the Athletic wing and final portion of the Performance Arts wing. Following completion of the new building construction in Phase 3, the remainder of the existing high school buildings (located to the north of the new buildings) will be demolished. New playing fields and a Stadium Toilet building, along with various site improvements will then be constructed in Phase 4

Under Construction

Educational

$235,000,000.00

Public - City

Demolition, New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
365
Active Projects
222
Bidding Soon
2,778
All Active Projects
1,274
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 10, 2020

March 31, 2021

img_map_placeholder

869 Massachusetts Ave, Arlington, MA


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.