BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work and new construction of an educational facility in Arlington, Massachusetts. Completed plans call for the demolition of a educational facility; for the construction of a 408,590-square-foot educational facility; and for site work for a educational facility.

Phase 1 construction of the first two wings of the new high school started in October and will be open to students in early 2022. The multi-phase project will be completed in 2025. For RFQ Contractor - New Arlington High School Building and Phased Demolition of the Existing Facility - Sub Request for Qualifications (RFQ) for Trade Contractors for the new Arlington High School Project. Construction of a a new 408,590 sq. ft. High School building and phased demolition of the existing facility located. The SOQ is for the following trades: (a) Masonry; (b) Miscellaneous and Ornamental Metals; (c) Waterproofing; (d) Roofing & Flashing; (e) Metal Windows; (f) Glass & Glazing; (g) Tile; (h) Acoustic Tile; (i) Resilient Flooring; (j) Painting; (k) Fire Protection; (l) Plumbing; (m) HVAC; (n) Electrical; and (o) Terrazzo. Sub Bid Category (a) Masonry; (b) Miscellaneous and Ornamental Metals; (c) Waterproofing; (d) Roofing & Flashing; (e) Metal Windows; (f) Glass & Glazing; (g) Tile; (h) Acoustic Tile; (i) Resilient Flooring; (j) Painting; (k) Fire Protection; (l) Plumbing; (m) HVAC; (n) Electrical; and (o) Terrazzo. This is a CM at Risk Project under M.G.L. c. 149A. Interested firms must submit a Statement of Qualifications (SOQ) by the deadline and be pre-qualified if they are interested in later bidding on this project. The RFQ contains specific criteria for trade contractor prequalification and selection. This RFQ is part of a two-step selection process for the Trade Contractors. First, interested firms must submit the SOQ and then, at a later date, only the pre-qualified firms will be invited to bid on the category of work for which they were pre-qualified. All firms must be pre-qualified for this Project even if they are already DCAM Certified. The CM is Consigli Construction CO., the OPM is Skanska, and the architect is HMFH Architects. Sub Bid Deadline 9/10/20 Time 12:00 P.M.

Award

Educational

$64,424,217.00

Public - City

Demolition, New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
298
Active Projects
156
Bidding Soon
2,828
All Active Projects
1,183
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 5, 2020

January 26, 2021

img_map_placeholder

869 Massachusetts Ave, Arlington, MA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.