EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 13, 2022 at 8:00 PM

Updated October 1, 2024

Site work, paving and outdoor lighting for a mixed-use development in Seattle, Washington. Completed plans call for site work for a playground / park / athletic field; sidewalk / parking lot; water / sewer project; for paving for a sidewalk / parking lot; and for outdoor lighting for a playground / park / athletic field.

https://theconstructionbroadsheet.com/seattle-awards-m-contract-for-new-pier-p874-174.htm - The Seattle Office of the Waterfront and Civic Projects has awarded a $34.5 million contract to local company Pacific Pile & Marine LP for construction of a new Pier 58, also known as Waterfront Park. The new pier is a replacement for the one removed in 2021. Construction on Pier 58 is scheduled to begin this fall and will take two years to complete. Also included in Pacific's contract is the removal of Pier 63, which has been closed since 2017 and is in poor condition. The city said that the dilapidated pier's removal will help the ecosystem there by allowing in more light, which will benefit the plants and marine life. "We're excited to reach this milestone and to be one step closer to having another new pier for the public to enjoy on our waterfront," said Angela Brady, director of the Waterfront Seattle Program, in a prepared statement. Pacific also built Pier 62, which opened in September 2020. The company rebuilt a portion of Pier 63 as well. "The new pier includes a marine habitat-sensitive design, will be a welcoming space for all and will include an iconic playground that will encourage visitors from near and far to visit," Brady said. The playground, project officials said, will have elements for all ages and abilities. Pier 58 also will include several areas where visitors can relax and look out on Elliott Bay, and the new venue will be able to host concerts, movies and other events. These projects are part of the $728 million Waterfront Seattle initiative, a city plan to build a park promenade that began construction after removal of the Alaskan Way Viaduct, a double-decked, elevated freeway that carried a portion of State Route 99. It was demolished in 2019 as part of a multibillion-dollar tunnel replacement. In addition to the pier work, Waterfront Seattle, which is scheduled to run through 2024, also includes construction of an elevated connection from Pike Place Market to the waterfront and improvements to the east-west connections between the city's downtown and Elliott Bay. ________________________________________________________________________________________________ As of April 13, 2022, the project has not been awarded. Intent to award is expected to be issued in approximately 3-4 weeks. The project. includes marine in-water work including the instal-lation of in-water piling, precast pile caps, precast prestressed, deck panels, cast-in-place con-crete, cast-in-place concrete top-ping slab with architectural fin-ishes, in-water habitat improve-ments, electrical and inech.ani.- cal systems, lighting, fire sup-pression systems, other utilities, grated steel pedestrian walkway, expansion joint plates, ,fountain, landscaping, play area, and rail-ing. Project also includes optional award elements including timber pier demolition and pile removal, and cathodic protection. systems. A/E ESTIMATE: $23,800,000 to $30,800,000 Base Bid; Additive 1: $1,200,000 to $1,450,000; Additive 2: $640,000 to $830,000; Additive 3: $21,000 to $28,000 Questions must be emailed by 5:00pm, 3 Business Days before Bid opening. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Requests for clarification are due Friday, March 4, 2022 5:00:00 PM [(UTC-08:00) Pacific Time (US & Canada)].

Award

Water / Sewer

$34,500,000.00

Public - City

Subscribe For Documents

120 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
91
Active Projects
51
Bidding Soon
890
All Active Projects
407
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 9, 2022

November 7, 2022

img_map_placeholder

To Be Determined, Seattle, WA

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.