BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Shelbyville, Tennessee. Completed plans call for site work for a water / sewer project.

For Diversion Weir Improvements Each bidder shall be properly licensed and abide by the provisions of TCA 62-6-119 including part (b) which states in part: "(b) The person or entity involved in the preparation of the invitation to bid or comparable bid documents, including any electronic bid documents, shall direct that the following information be written upon the bid envelope or provided within the electronic bid document: (1) The name, license number, expiration date thereof, and license classification of the contractor applying to bid for the prime contract; (2) The name, license number, expiration date thereof, and license classification of the contractor applying to bid for the masonry contract where the total cost of the materials and labor for the masonry portion of the construction project exceeds one hundred thousand dollars ($100,000); (3) The name, license number, expiration date thereof, and license classification of the contractor applying to bid for the electrical, plumbing, heating, ventilation, or air conditioning contracts except when such contractor's portion of the construction project is less than twenty-five thousand dollars ($25,000); (4) For each vertical closed loop geothermal heating and cooling project, the company name, department of environment and conservation license number, classification (G, L or G,L) and the expiration date, except when the geothermal portion of the construction project is in an amount less than twenty-five thousand dollars ($25,000); (5) Prime contractor bidders who are to perform the masonry portion of the construction project which exceeds one hundred thousand dollars ($100,000), materials and labor, the electrical, plumbing, heating, ventilation or air conditioning or the geothermal heating and cooling must be so designated; and (6) Only one (1) contractor in each of the classifications listed above shall be written on the bid envelope or provided within the electronic bid document." In compliance with TCA 12-4-126(a) and (b), the ENGINEER will not issue addenda less than forty-eight (48) hours before the bid opening date and time. Any questions concerning the bid documents shall be received by the ENGINEER before ninety-six (96) hours prior to the bid opening date and time. All bidders shall comply with all provisions of TCA 50-9-113 as it relates to Drug-Free Workplace requirements. The Contractor shall complete the Drug-Free Work Place Affidavit of the Prime Bidder form and submit it with his/her bid. The Contractor shall be responsible for any of its Subcontractor(s) compliance with said law. All bidders shall comply with all provisions of Chapter 878 of TCA 12-4-1 as it relates to certification of compliance regarding illegal immigrants. The Contractor shall complete the Statement of Compliance Certificate Illegal Immigrants and submit it with his/her bid. The Contractor shall be responsible for any of its Subcontractor's compliance with said law. All bidders shall comply with all provisions of Chapter 817 of TCA 12-12-106 as it relates to certification of compliance regarding the Iran Divestment Act. The Contractor shall complete the Statement of Compliance Certificate Iran Divestment Act and submit it with her/her bid. The Contractor shall be responsible for any of its Subcontractor's compliance with said law. The successful bidder is required to furnish both an acceptable performance bond and payment bond each in the amount of one hundred percent (100%) of the contract price. The Owner reserves the right to reject any all bids, to waive informalities, and to negotiate with the apparent qualified best bidder or bidders to such extent as may be necessary. No bidder may withdraw his bid for 90 days, while the Owner considers the bids. Mutually agreed upon time extensions may be made if necessary.

Award

Water / Sewer

$279,000.00

Public - City

Site Work

5

4

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
163
Active Projects
107
Bidding Soon
1,357
All Active Projects
596
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

September 22, 2020

October 22, 2020

January 20, 2021

img_map_placeholder

Multiple Locations, Shelbyville, TN

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.