Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 30, 2023 at 7:00 PM
Updated January 27, 2024
Site work and paving for a bridge / tunnel in Dublin, Ohio. Conceptual plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
This project is included in the City of Dublin's fiscal years 2024-2028 Capital Improvement Plan (CIP). As of November 30, 2023, further details regarding design and construction have not been identified. A firm timeline for construction has nor been established; however, funding is funding in 2024 is for detailed design. The preliminary engineering work currently underway is not scheduled to finish until December 2023. It will include detailed design work in the winter 2023 Consultant Services Bulletin, but not be awarded until 2024. A detailed scope has not yet been released. Funding for this project provides for a new crossing over I-270 from Tuller Road to Emerald Parkway in lieu of widening Sawmill Road to seven lanes. It is a key recommendation of the Sawmill Road Corridor Study completed in 2019. It is located in the easternmost part of the Bridge Street District, connecting Tuller Road on the south side of I-270 with Emerald Parkway on the north side of I-270. The project is currently in the Preliminary Engineering phase. Detailed design and construction costs included are based on the planning level assumptions included in the current study and will be updated as the project develops. This project supports the Mount Carmel Hospital site development, and is expected to ease traffic operations in the Sawmill Road corridor, as growth continues in the area. The new crossing will also enhance pedestrian and bicycle access across the limited access facility, connecting neighborhoods and creating vitality, highlighting Dublin's commitment to high quality. The closed solicitation has been included below for reference. The city of Dublin is looking to acquire a property for a proposed bridge crossing project over Interstate 270. The initiative aims to connect the Bright Road neighborhood and the Bridge Street District.
Conceptual
Bridges / Tunnels
$19,840,000.00
Public - City
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
