BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a bridge / tunnel in Dublin, Ohio. Conceptual plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

This project is included in the City of Dublin's fiscal years 2024-2028 Capital Improvement Plan (CIP). As of November 30, 2023, further details regarding design and construction have not been identified. A firm timeline for construction has nor been established; however, funding is funding in 2024 is for detailed design. The preliminary engineering work currently underway is not scheduled to finish until December 2023. It will include detailed design work in the winter 2023 Consultant Services Bulletin, but not be awarded until 2024. A detailed scope has not yet been released. Funding for this project provides for a new crossing over I-270 from Tuller Road to Emerald Parkway in lieu of widening Sawmill Road to seven lanes. It is a key recommendation of the Sawmill Road Corridor Study completed in 2019. It is located in the easternmost part of the Bridge Street District, connecting Tuller Road on the south side of I-270 with Emerald Parkway on the north side of I-270. The project is currently in the Preliminary Engineering phase. Detailed design and construction costs included are based on the planning level assumptions included in the current study and will be updated as the project develops. This project supports the Mount Carmel Hospital site development, and is expected to ease traffic operations in the Sawmill Road corridor, as growth continues in the area. The new crossing will also enhance pedestrian and bicycle access across the limited access facility, connecting neighborhoods and creating vitality, highlighting Dublin's commitment to high quality. The closed solicitation has been included below for reference. The city of Dublin is looking to acquire a property for a proposed bridge crossing project over Interstate 270. The initiative aims to connect the Bright Road neighborhood and the Bridge Street District.

Conceptual

Bridges / Tunnels

$19,840,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
99
Active Projects
59
Bidding Soon
1,476
All Active Projects
513
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.