BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 1, 2024 at 8:00 PM

Updated November 28, 2024

Site work and paving for a mixed-use development in Monterey, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

In general, the work consists of, but is not limited to, re-constructing the existing recreation trail at Casa Verde and installing other intersection and traffic signal improvements at the intersection of Del Monte and Casa Verde. The work shall include, but not be limited to, removing existing pavement; new pavement for the realigned bicycle trail; modifying median islands; reconstructing curb returns to allow joint pedestrian and bicycle traffic; modifying traffic signals to accommodate dedicated left-turn phasing on Casa Verde and a Leading Pedestrian Interval (LPI), realigned crosswalks and lane geometry modifications; installing storm drain improvements; and new streetlighting. The Contractor, at the time of signing and executing the contract, shall execute and file with the City a performance bond to the satisfaction and approval of said City, in a sum of not less than one hundred percent (100%) No Bidder may withdraw their bid for a period of ninety (90) days from the Bid Opening Date, which time shall be used by the City for reviewing the bids and investigating the qualifications of Bidders, prior to awarding of the contract. The City reserves the right to reject any or all bids as the best interests of the City may dictate and, to the extent permitted by law, waive any irregularity in any bid. If there is any reason for believing that collusion exists among the bidders, the City may reject any or all bids

Bid Results

Roads / Highways

$1,600,690.00

Public - City

Paving, Site Work

23

7

4

3

Subscribe For Documents

30 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
181
Active Projects
74
Bidding Soon
1,135
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 30, 2024

May 29, 2024

Project location map

Casa Verde Way & Del Monte Ave, Monterey, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.