BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving, new construction and renovation of an office development in Los Angeles, California. Completed plans call for the demolition of a office development; for the construction of a office development; for the renovation of a office development; for site work for a office development; and for paving for a office development.

Q&A Deadline : September 11, 2020 2:00 PM PHASE 1: INITIATE DESIGN, AND DEMOLITION OF OLD ADMINISTRATION BUILDING AND DSPS BUNGALOWDesignComplete demolition drawings. Initiate design of Southeast Hall and alternates if applicable. Prior to demolition, District will coordinate relocation; contractor will coordinate utility disconnection and refeeds.Demolition of Old Administration Building Demolish existing one-story, concrete frame, unoccupied, 28,474 SF building built in 1963. Area to be prepared for construction of new building. Scope includes hazardous materials abatement as noted in referenced report.Demolition of DSPS BungalowDemolish existing one-story 2,461 SF modular building installed in 1971. After demolition, area to be restored to match existing surrounding area and reconnection to site lighting. PHASE 2: SOUTHEAST HALL, SITE WORK AND ALTERNATESSoutheast Hall (SEH) and Site WorkConstruction of new two-story, approximately 49,600 GSF multi-purpose building and new landscape/hardscape at the Multi-purpose Room plaza. Uses to be housed include Nursing and Health Sciences, Equity Programs, Disabled Student Services, and the Student Health Center. The scope of work also includes new East Parking Lot with electrical vehicle charging stations (EVCS), infrastructure for future EVCS installation, renovation of parking lot #1 (South Lot) and renovation of parking lot #10 (North Lot) to provide new accessible stalls. The East Parking Lot scope may involve coordination with public agencies for impact to the existing easement.New Campus Drop-off and Entry Plaza (Alternate)If the alternate is approved, construction of new landscape and hardscape to create a vehicular entry driveway loop and pedestrian plaza. This scope may involve coordination with public agencies for impact to the public right-of-way.Sidewalk Replacement (Alternate)Demolition of existing sidewalk and construction of new sidewalk adjacent to SEH project site. This scope may involve coordination with public agencies for impact to the public right-of-way.New East Vending Kiosk (Alternate)If the alternate is approved, installation of a vending machine kiosk with integral roof and cage and associated utilities.Installation of Additional EV Charging Stations (Alternate)If the alternate is approved, installation of electrical vehicle charging stations at each stall in New East Parking Lot. PHASE 3: DEMOLITION OF GENERAL CLASSROOM AND NURSING BUILDINGS, WEST COURTYARD LANDSCAPE/HARDSCAPE AND ALTERNATEDesignCompletion of design documents for demolition and landscape/hardscape, and DSA submittal. Prior to demolition, District will coordinate relocation and FF&E training; contractor will coordinate utility disconnection and refeeds.Demolition of General Classroom BuildingDemolish existing two-story, 17,927 SF, wood frame building built in 1969. Area to be prepared for new landscape/hardscape. Scope includes hazardous materials abatement as noted in referenced report.Demolition of Nursing BuildingDemolish existing one-story, 21,375 SF, steel frame building built in 1980. Area to be prepared for new landscape/hardscape. Scope includes hazardous materials abatement as noted in referenced report.West CourtyardConstruction of approximately 86,000 SF of new landscape and hardscape on site of demolished General Classroom and Nursing Buildings. Scope includes relocation of existing irrigation controller and reconnection of power for controller and site lights.New West Vending Kiosk (Alternate)If the alternate is approved, demolition of existing Snack Bar building housing the vending machines, installation of a vending machine kiosk with integral roof, cage and associated utilities. Scope also includes additional landscape/hardscape and utilities in area of Snack Bar building demolition. Shortlist confirm

Post-Bid

Office

$45,000,000.00

Public - County

Demolition, New Construction, Paving, Renovation, Site Work

286

37

74

4

Subscribe For Documents

257 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
225
Active Projects
132
Bidding Soon
2,339
All Active Projects
1,068
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 25, 2020

April 15, 2021

img_map_placeholder

1111 Figueroa Pl, Los Angeles, CA


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.