BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Grove Park-Tilden Township, Minnesota. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; swimming pool; and water / sewer project.

A Bidders Bond being at least 10% of the proposal amount is required for this project. Work items (estimated quantities) are: Dewatering (1 LS); Strom Water Management - Silt Fence (60 LF), Floatation Silt Curtain (40 LF); Remove Existing Structure - 18" RCP (48 LF) and 5' x 5' Concrete Drop Inlet with Gate/Walkway (1 EA); Common Excavation (350 CY); New Water Control Structure - Structural Concrete (16 CY), #4 Steel Reinforcement (1,420 LF), Mud Mat (1.1 CY), Structure Catwalk (1 EA), 3' x 5.5' Stoplog Bay (1 EA), 6" Aluminum Stoplogs (5 EA), Stoplog Lifting Poles (2 EA), Stoplog Locking System (2 EA); Random Riprap Class 1 (15 CY), Random Riprap Class 3 (30 CY), Geotextile Filter Type 3 (61 SY), Geotextile Filter Type 4 (60 SY), Erosion Control Blanket (240 SY). From the intersection of US Highway 2 and MN Highway 32 drive south on Highway 32 8 miles to 360th SE. Go west on 360th St SE 2.75 miles, then north on 138th Ave SW 0.6 miles. The project access road is west of 138th Ave SW, and the structure is .25 miles west and .25 miles north of the access point. Completion Date: 11/05/2020

Award

Swimming Pools

$148,400.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
19
Active Projects
14
Bidding Soon
117
All Active Projects
54
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 22, 2020

October 22, 2020

img_map_placeholder

US-2 & MN-32, Grove Park-Tilden Township, MN


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.