BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 25, 2020 at 7:00 PM

Updated January 29, 2024

Site work for a water / sewer project in Turrell, Arkansas. Completed plans call for site work for a water / sewer project.

***As of October 07,2020, this project has not yet been awarded. A timeline for award has not yet been established. ADVERTISEMENT FOR BIDS City of Turrell Owner 460 Eureka Street Address Turrell, AR 72384 Separate sealed BIDS for the installation of water meters will be received by the Owner at the office of the Owner until 11:30 am, on Tuesday, September 29, 2020_ and then at said office publicly opened and read aloud. The CONTRACT DOCUMENTS may be examined at the following locations: Bond Consulting Engineers East, Inc.; 3683 State Highway 77 North, Marion, AR 72364 Copies of the CONTRACT DOCUMENTS may be obtained at the office of Bond Consulting Engineers East, Inc. located at 3683 State Highway 77 North, Marion, AR 72364 upon payment of $200.00 for each set. 75311722f The OWNER may at any time, as the need arises, order changes within the scope of the WORK without invalidating the Agreement. If such changes increase or decrease the amount due under the CONTRACT DOCUMENTS, or in the time required for performance of the WORK, an equitable adjustment shall be authorized by CHANGE ORDER. The ENGINEER, also, may at any time, by issuing a FIELD ORDER, make changes in the details of the WORK. The CONTRACTOR shall proceed with the performance of any changes in the WORK so ordered by the ENGINEER unless the CONTRACTOR believes that such FIELD ORDER entitles the CONTRACTOR to change in CONTRACT PRICE or TIME, or both, in which event the CONTRACTOR shall give the ENGINEER WRITTEN NOTICE thereof within seven (7) days after the receipt of the ordered change. Thereafter the CONTRACTOR shall document the basis for the change in CONTRACT PRICE or TIME within thirty (30) days. The CONTRACTOR shall not execute such changes pending the receipt of an executed CHANGE ORDER or further instruction from the OWNER.

Award

Water / Sewer

$81,819.00

Public - City

Site Work

3

5

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
86
Active Projects
36
Bidding Soon
616
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 29, 2020

October 29, 2020

Project location map

To Be Determined, Turrell, AR

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.