Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
This is a service / maintenance or supply contract in Warren, Ohio. Contact the soliciting agency for additional information.
Estimated Budget: $195,000.00 (2021) $215,000.00 (2022) $200,000.00 (2023).l Experience in bridge inspection and reporting procedures. See Scope of Services. It is anticipated that the selected Consultant will be authorized to proceed by January 2021. Suspended or Debarred Firms Firms included on the current Federal list of firms suspended or debarred are not eligible for selection. Scope of Services During the calendar years 2021 and 2023 the consultant shall inspect approximately 378 structures. During the 2022 calendar year the consultant shall inspect the same 378 structures along with an additional 58 structures which are less than 10 feet in span. To be included with the inspection, the consultant shall provide two (2) hard cover bound books containing inspection data (with comments) presented in the most current field report format; two (2) sets of thirty-two (32) soft cover bound books containing the inspection data for structures inventoried within each township and incorporation; one (1) soft cover bound book titled "Photographs of Bridge Deficiencies" which shows all deficiencies noted during inspection; two (2) bound books indicating bridge load posting sign status; two (2) bound books indicating traffic sign status; a listing of structures that have a conflict between County journalized load reduction entries and load posting signs in the field; a list of structures requiring immediate repairs or analysis; a summary of bridges on County Inventory for each year inspected; and two (2) sets of ODOT BR86 forms for submittal to ODOT and for Trumbull County Engineer files. Said information shall be completed and submitted to the Trumbull County Engineer during the month of December during each inspection year. The selected consultant may also be asked to perform scour and fracture critical assessments, complete inventory data, and bridge load ratings on an as needed basis. Requirements for Letters of Interest, Programmatic Selection Process A. Instructions for Preparing and Submitting a Letter of Interest 1. Provide the information requested in the Letter of Interest Content (Item B below), in the same order listed, in a letter signed by an officer of the firm. Do not send additional forms, resumes, brochures, or other material. 2. Letters of Interest shall be limited to ten (10) 8" x 11" single sided pages plus two (2) pages for the Project Approach (Item B.5 below). 3. Please adhere to the following requirements in preparing and binding letters of interest: a. Please use a minimum font size of 12-point and maintain margins of 1" on all four sides. b. Page numbers must be centered at the bottom of each page. c. Use 8" x 11" paper only. d. Bind letters of interest by stapling at the upper left hand corner only. Do not utilize any other binding system. e. Do not provide tabbed inserts or other features that may interfere with machine copying. B. Letter of Interest Content 1. List the types of services for which your firm is currently prequalified by the Ohio Department of Transportation. 2. List significant subconsultants, their current prequalification categories and the percentage of work to be performed by each subconsultant. 3. List the Project Manager and other key staff members, including key subconsultant staff. Include project engineers for important disciplines and staff members that will be responsible for the work. Address the experience of the key staff members on similar projects, and the staff qualifications relative to the selection subfactors noted. 4. Describe the capacity of your staff and their ability to perform the work in a timely manner, relative to present workload, and the availability of the assigned staff. 5. Provide a description of your Project Approach, not to exceed two pages. Confirm that the firm has visited the site and address your firm's technical approach, understanding of the project, innovative ideas and any other relevant information concerning your firm's qualifications for the project. Address your firm's project specific plan for ensuring increased quality, reduced project delivery time and reduced project costs. Items 1 thru 5 must be included within the 10-page body of the LoI. Remaining space within the ten (10) pages may be utilized to provide personnel resumes or additional information concerning general qualifications. Additional Notices As required by Ohio Revised Code 153.65-71, responding firms qualifications will be reviewed and evaluated and a qualified firm will be selected based on a Selection Rating Process. Trumbull County will then finalize the project scope of work and negotiate a contract and fee with said firm. Attention is also directed to all firms that Trumbull County adopted a "Drug and Alcohol Free Workplace Policy" on September 7, 2016, and the terms of this Policy also apply to any Contractors directly reimbursed for services through the County; a copy of the Policy to be part of the Statement of Qualifications along with the "Sign-Off Sheet duly signed by the firm thereof. The attention of the firm is directed to the requirement that each Statement of Qualifications must be accompanied by a Non-Collusion Affidavit and a Personal Property Delinquent Tax duly signed by an authorized representative of the firm. The method of contractor selection has not been determined at this time.
Design
Bridges / Tunnels
$195,000.00
Public - County
Service, Maintenance and Supply
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 26, 2022
Multiple Locations, Warren, OH
Related To This Project
Warren, OH
--
Warren, OH
Bid Date: May 10 2022
Warren, OH
Bid Date: Nov 14 2023
Warren, OH
--
Warren, OH
Bid Date: Nov 02 2023
Warren, OH
Bid Date: Nov 09 2023
Warren, OH
Bid Date: Dec 06 2023
Warren, OH
Bid Date: Nov 30 2023
Warren, OH
Bid Date: Mar 01 2022
Warren, OH
Bid Date: Feb 07 2022
Warren, OH
Bid Date: Mar 25 2022
Warren, OH
Bid Date: Feb 09 2022
Warren, OH
Bid Date: Feb 24 2022
Warren, OH
Bid Date: Mar 03 2022
Warren, OH
Bid Date: Mar 03 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.