BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Renovation of a water / sewer project in Austin, Texas. Completed plans call for the renovation of a water / sewer project.

**As of December 14, 2020, project was awarded to Sayers Construction-Jingoli Power for a total contract amount not to exceed $24,602,153.40. Construction of the Ullrich Low Service Pump Station electrical switchgear building (Substation No. 4) and service road, the installation of ductbank and equipment pads for Austin Energy primary metering equipment, the installation of 919 LF of 4FT x 5FT Ductbank, 585 LF of 12IN x 18IN Ductbank, installation of 10 electrical manholes, renovation of the 480 volt power distribution system at the Low Service Pump Station, replacement of the medium voltage service transformer at the Powder Activated Carbon building, and all associated electrical, mechanical, and instrumentation work required to build a fully functional system. MBE/WBE Goals: African American 1.40%, Hispanic 3.38%, Native/Asian 1.22%, WBE 1.41% This contract is contingent upon release of funds from the Texas Water Development Board (TWDB). Any contract or contracts awarded under this Invitation for Bid (IFB) or Request for Qualifications (RFQ) are expected to be funded in part by financial assistance from the TWDB. Neither the U.S. Environmental Protection Agency (EPA) or the State of Texas, nor any of its departments, agencies, or employees, are or will be a party to this IFB, RFQ, or any resulting contract. All qualified Applicants will receive consideration for employment without regard to race, color, religion, sex (including pregnancy), sexual orientation, gender identity, national origin, age (40 or older), disability, or genetic information. Bidders on this work will be required to comply with the Department of Labor regulations at 41 CFR Part 60-4, relating to Construction Contractors--Affirmative Action Requirements, which include the President's Executive Order No. 11246, as amended by Executive Order No. 11375 and Executive Order No. 13672, in the award and administration of contracts awarded under TWDB financial assistance agreements. Failure by the Contractor to carry out these requirements is a material breach, which may result in the termination of the awarded financial assistance. Any contract(s) awarded under this Invitation for Bids is/are subject to the American Iron and Steel (AIS) requirements of Section 608 of the Federal Water Pollution Control Act." Davis Bacon prevailing wage requirements apply to the construction

Award

Water / Sewer

$24,602,153.00

Public - City

Renovation

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
72
Active Projects
33
Bidding Soon
2,360
All Active Projects
920
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.