EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 22, 2020 at 8:00 PM

Updated November 15, 2023

Demolition, site work, renovation and addition to a water / sewer project in Onawa, Iowa. Completed plans call for the addition of a water / sewer project; for the demolition of a water / sewer project; for the renovation of a water / sewer project; and for site work for a water / sewer project.

The City of Onawa, Iowa, reserves the right to reject any and all bids and to waive informalities. A public hearing will be held by the City of Onawa, Iowa, on the proposed contract documents (plans, specifications and form of contract) and estimated cost for the improvement at its meeting at 7:00 PM on September 8, 2020, in the Council Chambers at City Hall, 914 Diamond St., Onawa, Iowa, for the 2020 Onawa Feeder 5 Addition & Distribution Upgrades, Onawa, Iowa. The work shall commence on the day indicated in the Notice to Proceed and shall be substantially completed on or before April 27, 2021 and completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions on or before May 25, 2021. Should the Contractor fail to complete the work in this timeframe, liquidated damages of $250.00 per calendar day will be assessed to the work not completed within the designated contract term. Each bidder shall accompany its bid with bid security as defined in Iowa Code Chapter 26, Section 26.8, and as specified by the City of Onawa, Iowa, in the amount fixed in the Instructions to Bidders. Copies of the contract documents are on file with the City of Onawa for examination by bidders. By virtue of statutory authority, preference will be given to products and provisions grown and coal produced within the State of Iowa, and to Iowa domestic labor, to the extent lawfully required under Iowa statutes. The general nature of the public improvement islabor only to add new underground 13.2Y/7.62 kV Feeder #5 and upgrade approximately 4 blocks of 2.4 kV single-phase to 13.2Y/7.62 kV underground primary distribution. Demolition/retirement of existing facilities and all incidentals for a complete operational system. 00 10 00 - 2 The successful bidder will be required to furnish bonds in an amount equal to one-hundred percent (100 percent) of the contract price, said bonds to be issued by a responsible surety approved by the City Council and shall guarantee the faithful performance of the contract and terms and conditions therein contained and shall guarantee the prompt payment for all materials and labor and protect and save harmless the City from claims and damages of any kind caused by the operations of Contractor.

Award

Water / Sewer

$223,735.00

Public - City

Addition, Demolition, Renovation, Site Work

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Work Restrictions, Use of Site, Price and Payment Procedures, Allowances, Cash Allowances, Unit Prices, Alternates, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Quality Control, Temporary Facilities and Controls, Temporary Utilities, Construction Facilities, Sanitary Facilities, Vehicular Access and Parking, Traffic Control, Project Identification, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Closeout Submittals, Bonds, Warranties
Division 08 - Openings

Division 08 - Openings

Glazing, Glass Glazing
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Fill, Backfill, Compaction
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Common Work Results for Exterior Improvements, Aggregates for Exterior Improvements, Bases, Ballasts, and Paving, Planting, Turf and Grasses, Seeding
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Clamps

Find More Local Projects

Within 75 Miles of This Project
48
Active Projects
35
Bidding Soon
395
All Active Projects
194
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 17, 2020

October 19, 2020

img_map_placeholder

To Be Determined, Onawa, IA

Related To This Project


Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

2020 Onawa Feeder 5 Addition and Distribution Upgrades

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.