BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in City of Industry, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; bridge / tunnel; bridge / tunnel; and water / sewer project.

https://www.theconstructionindex.co.uk/news/view/skanska-picked-for-californian-road-scheme The US$96m (GBP71m) contract also includes a four-track rail bridge and a road bridge. Client for the Fullerton Road grade separation project is the San Gabriel Valley Council of Governments. The project will lower Fullerton Road under the existing Union Pacific railway tracks between Rowland Street and State Route 60. It is estimated to reduce about 50 vehicle-hours of delay at the crossing each day. At present, the crossing is traversed by 49 trains per day, a figure projected to increase to 91 trains by 2025. "Skanska is committed to bringing useful, tangible change to our communities, and the Fullerton Road Grade Separation Project is exactly the kind of development we prioritise," said James Bailey, Skanska USA senior vice president and general manager of civil operations in California. "We look forward to improving this crossing for the betterment of Los Angeles County residents and visitors alike." Construction will begin this month, with completion expected in October 2024. --------------------------------------------------------------------------------------------------------------------------------------------------- The project is to complete a partially completed project. The project is located in the City of Industry crossing the Union Pacific Railroad (UPRR) Los Angeles Subdivision and Metrolink (Riverside Line) at UPRR milepost (MP) 21.43. This project eliminates the existing at-grade crossing at this location through construction of a combination of railroad flyover and roadway underpass. A Railroad Street overcrossing and pedestrian bridge south of the railroad bridge will be constructed. Project Limits: Fullerton Road will be lowered beneath the UPRR railroad from 600 ft north of Railroad Street to 300 ft. south of Gale Avenue. Gale Avenue will be lowered from 400 ft east of Fullerton Road to 400 ft west of Fullerton Road This project also includes roadway improvements (reconstruction, widening and realignment) for: - Fullerton Road: from Rowland/San Jose Street to Pomona Freeway (Route 60) eastbound off-ramp; - Pomona Freeway (Route 60) westbound on and off-ramps at Fullerton Road. Project Scope Items: The project work includes, but is not limited to the construction of typical street features such as curb, gutter, sidewalk, roadway structural section, landscape and irrigation and site improvements. Demolition and excavation for underpass bridge substructure elements, construction of piles, pile caps, abutments, columns and column bent, 93' wide UPRR two-track steel bridge, 52' wide Railroad Street concrete bridge, prefabricated steel pedestrian bridge, partial demolition and reconstruction of a multi-use path undercrossing, earth retaining structures, pump station, groundwater pump, grading, preparing site within UPRR right-of-way and construct shoofly tracks, storm drain realignment, culverts, sewer siphon with airline, relocation of fiber optic lines, utility casings, install street and lot lighting, installation of temporary and permanent signals and modifications, signing and striping, protection and/or relocation of existing dry and wet utilities. Temporary work consists of shoring, excavation support systems and provide traffic control features. Estimated Bid Value - $65,000,000 to $75,000,000. Project Duration - 911 Days. Bid Bond - 10.00%. Payment Bond - 100.00%. Performance Bond - 100.00%. Online Q and A - Yes. Q and A Deadline - 03/02/2021 5:00 PM (PST). Small Business Enterprise (SBE) Goal 10% Type of Award Lump Sum License Requirements Class A

Award

Roads / Highways

$75,000,000.00

Public - City

Paving, Site Work

749

105

81

3

Subscribe For Documents

105 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
483
Active Projects
231
Bidding Soon
3,730
All Active Projects
1,680
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

April 6, 2021

June 7, 2021

December 5, 2023

img_map_placeholder

Fullerton Rd, City of Industry, CA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.