BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 7, 2020 at 8:00 PM

Updated August 29, 2025

Site work and paving for a mixed-use development in Sterling, Illinois. Completed plans call for site work for a sidewalk / parking lot; water / sewer project; and for paving for a sidewalk / parking lot.

As of 9/21/2020, project scheduled to be awarded tonight. construction of Frasor Center Improvements. This project involves HMA and sidewalk removal, grading, HMA paving, sidewalk, curb and gutter, storm sewer, striping and associated items. All requirements and details are described and listed on the plans and in the project specification. Removal ofthe existing HMA pavement, sidewalk and concrete drive at the north overhead door then reconstructing those areas as shown on the plans. In addition, a storm sewer is to be extended from the detention basin to the south through the paved area and to the north overhead door. Work will also include striping seeding and other associated items. The Sterling Park District reserves the right to reject any or all proposals, to waive technicalities and to accept the proposal that the Sterling Park District Board of Commissioners believes to be in the best interest of the Sterling Park District.

Award

Sidewalks / Parking Lot

$89,760.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
187
Active Projects
114
Bidding Soon
1,378
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 17, 2020

October 19, 2020

Project location map

1913 3rd Ave, Sterling, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.