BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Bakersfield, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

**As of June 25, 2024, This project has been awarded to C.A. Rasmussen, Inc. , with the awarded amount of $16,199,053.73 .** The project consists of a 6-mile-long multiuse path from the Kern River Channel to 7th Standard Road. The trail would run in a north-south orientation. The trail would be 12-feet-wide and constructed of asphalt with 4-foot-wide dirt shoulders. A chain-linked fence would be installed on both sides of the trail where existing fencing does not exist. There will be three multi use path crossings within the Friant Kern Canal right of way. The work consists of, but is not necessarily limited to, the construction of a new 135-foot pedestrian bridge crossing over the outfall of the Friant-Kern Canal and within the Kern River floodplain, the construction of a golf cart path undercrossing adjacent to the Riverlakes Golf Course, and the construction of a 75-foot pedestrian bridge crossing adjacent to Madison Grove Park. A prefabricated pedestrian overcrossing steel structured bridge would be constructed at the existing Burlington Northern Santa Fe (BNSF) railroad right of way. The trail would be used for alternative transportation and recreation; as well as serve as an interconnection to community parks, school, shopping centers, and the Kern River Parkway.

Award

Roads / Highways

$16,199,054.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

72 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
35
Active Projects
22
Bidding Soon
406
All Active Projects
164
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 2, 2024

July 1, 2024

img_map_placeholder

To Be Determined, Bakersfield, CA


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.