BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a fire / police facility in Birmingham, Alabama. Completed plans call for the renovation of a fire / police facility.

No pre-qualification of bidders will be conducted prior to receiving bids. Under the Alabama State Code, Section 39-2-4, as amended by Act #2017-279, it is required for any contract exceeding $50,000 that the Bidder submit with his bid, either a cashier's check, drawn on an Alabama bank, or a bid bond, executed by a surety authorized and qualified to make bonds in Alabama, payable to the City of Birmingham, in an amount (subject to a maximum of $10,000.00) equal to five percent (5%) of the bid. In order for a bid to be considered, it must be accompanied by an acceptable bid bond or cashier's check. Any bid submitted for an amount of $50,000 or more, the bidder must be a licensed general contractor in the State of Alabama in accordance with Section 34-8, of the Alabama State Code. Contractor's license number shall appear on the outside of the envelope used to submit bid. A Performance Bond in the amount of 100% of the contract amount and a Statutory Labor and Material Payment Bond in the amount of 100% of the contract amount will be required from the successful bidder at the signing of the contract. Also, proof of insurance will be required when the contract is signed. The City will review bonds and insurance and execute the contract within twenty (20) days unless the successful contractor agrees to an extension in writing. Bidders are expected to prepare their bid to include all necessary material, labor, bonds, permits, overhead, profit, taxes, insurance, etc. costs. It is not the City's obligation to bring mistakes/omissions in bid to bidder's attention. If after bid opening, a bidder determines he has a mistake in bid, he may seek withdrawal of his bid without forfeiting his bond, if the request is in writing within three (3) work days after the bid opening, and is accompanied by clear and convincing evidence of the mistake. All cashier's checks or bid bonds will be returned immediately after bids are checked and tabulated to all except the three (3) lowest bona fide bidders. A Notice to Proceed will be issued by the City within fifteen (15) days after final contract execution unless both parties agree in writing to a longer period of time. Special attention is called to the applicability of the Birmingham Plan-Construction Industry Program to the project. Under this Program, the utilization of Minority Business Enterprises and Disadvantaged Business Enterprises (MBE/DBE) is encouraged on a voluntary basis. The Construction Industry Authority established a system of floating MBD/DBE goals which may differ from year to year and project to project. Under this Program, the utilization of Minority Business Enterprises and Disadvantaged Business Enterprises (MBE/DBE) is encouraged on a voluntary basis. The Construction Industry Authority established a system of floating MBD/DBE goals which may differ from year to year and project to project. Overall, these goals shall not be less than the historical participation of MBD/DBE's in construction projects of the City and its agencies. Additional information about this Program is contained in the Project Manual and may be obtained from the Executive Director, Birmingham Construction Industry Authority at 3600 4th Avenue, South, Birmingham, Alabama 35222 (Telephone: 205-324-6202). Bids received after this time will not be considered. The City reserves the right to reject any or all bids submitted, and to waive any informalities.

Award

Fire / Police

$96,136.00

Public - City

Renovation

8

4

8

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
56
Active Projects
34
Bidding Soon
559
All Active Projects
237
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 22, 2020

October 22, 2020

img_map_placeholder

7713 Division Ave, Birmingham, AL

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.