Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a mixed-use development in Cherokee, Oklahoma. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.
Project number- 20025 Scope of work: LS MOBILIZATION 1,840 SY 1 1/2" S4 SURFACE COURSE ASPHALT OVERLAY 13,110 SY 2" S4 SURFACE COURSE ASPHALT OVERLAY Small business and minority owned business sources are encouraged to bid on this project. A bid bond in the amount of 5% of the total amount bid shall be attached to all bids as a guarantee that the successful bidder will within ten (10) days from the date of notice of award, enter into contract and file the required bonds, and furnish a certificate of Workmans Compensation and General Contractors Liability Insurance. The City of Cherokee/Cherokee Development Authority reserves the right to reject any and all bids, waive any irregularities or technicalities without assigning any reason therefore, and to make the awards in the best interest of the Owner. The City of Cherokee/ Cherokee Development Authority reserves the right to withhold any contract awarded subject to the availability of funds. All bids must include assurances that the following provisions will be complied with: Federal Labor Standards Provisions U. S. Department of Labor 29 CFR Part 5; Section 3 of the Housing and Urban Development Act of 1968, as amended, 12 U.S.C. 170IU which requires that to the greatest extent feasible opportunities for training and employment be given lower incomeresidents of the Town of Cherokee Development Authority and contracts for work in connection with the project be awarded to business concerns which are located or owned in substantial part by persons residing in the area of the project. Section 109 of the Housing and Community development Act of 1974 which assures that no person shall on the grounds of race, color, national origin or sex be excluded from participation in, be denied the benefits of, or be subjected to discrimination; Certification of Non-segregated Facilities which assures thatbidder does not maintain or provide any segregated facilities; Equal Opportunity Provision, EO 11246, as amended, which assures non discrimination; Minority Business Enterprise and Women Business Enterprise Provisions which encourage minority owned businesses and women owned businesses to paid on the project; assurances that surety companies executing bonds appear on the Treasury Department's list and are authorized to transact business in the State of Oklahoma. Contracts for this construction will require the submissions of a preliminary statement of anticipated work force and subcontractor needs for project construction work, as well as the submission of written goals (number of employees and dollar amount to subcontractors) for utilization of lower-income residents and small and disadvantaged businesses located within Alfalfa County. The City of Cherokee/Cherokee Development Authority reserves the right to reject any of all bids, waive any irregularities or technicalities without assigning any reason therefore, and to make the awards in the best interest of the Owner. (Bid shall be awarded to the lowest, responsive and responsible bidder). No Bidder may withdraw his bid within 60 days after theactual date of the opening thereof. Bids are solicited and a contract award will be made pursuant to the Public Competitive Bidding Act of 1974 as amended (Title 61, O.S. 1981, Sections 101-136 et seq.). 1. MOBILIZATION: This item shall be paid for on a lump sum price bid. This item will be the Mobilization of equipment and material necessary to complete this project. This item shall be the complete mobilization for this project including multiple movements to and from the project to construct the project, complete in place including all materials and labor incidental thereto. All traffic control shall be incidental to the mobilization line item and shall be installed to the MUTCD standard. If necessary, contractor shall include construction staking in this item. 2. 1 1/2" S4 SURFACE COURSE ASPHALT OVERLAY: This item shall be paid for on a per square yard price bid. This item will be the furnishing and installation of 1 1/2" thick, Superpave Type S4 asphalt Overlay complete in place including tack coat, hauling, rolling, compacting, and all materials and labor incidental thereto in accordance with the Plans and Specifications. Raising valve boxes and manholes will be incidental to this line item. Any valve boxes or manhole adjustments shall be included in this line item. 3. 2" S4 SURFACE COURSE ASPHALT OVERLAY: This item shall be paid for on a per square yard price bid. This item will be the furnishing and installation of 2" thick, Superpave Type S4 asphalt Overlay complete in place including tack coat, density testing, hauling, rolling, compacting, and all materials and labor incidental thereto in accordance with the Plans and Specifications. Raising valve boxes and manholes will be incidental to this line item. Any valve boxes or manhole adjustments shall be included in this line item.
Award
Roads / Highways
$355,425.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 26, 2022
February 25, 2022
Ohio Ave, Cherokee, OK
Related To This Project
Cherokee, OK
--
Cherokee, OK
--
Cherokee, OK
Bid Date: Sep 27 2023
Cherokee, OK
--
Cherokee, OK
--
Cherokee, OK
Bid Date: May 31 2024
Cherokee, OK
--
Cherokee, OK
Bid Date: Nov 21 2024
Cherokee, OK
Bid Date: Mar 18 2022
Cherokee, OK
Bid Date: Feb 28 2022
Cherokee, OK
--
Cherokee, OK
--
Cherokee, OK
Bid Date: May 08 2024
Cherokee, OK
--
Cherokee, OK
Bid Date: Jun 27 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.