BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a water / sewer project in Oakland, California. Completed plans call for site work for a water / sewer project.

The work of this 184 calendar day project consists, in general, of furnishing all labor, materials, appliances, tools, equipment, transportation, services and supervision required to rehabilitate and replace existing sanitary sewer lines in Outer Harbor Area, including, but not limited to: plug and abandon sewer lines that are not in service, furnish and install cured-in-place liners, pipe bursting furnish and install new underground sewer pipelines and manholes, furnish and install new under wharf sewer pipeline, rehabilitate and repair existing sewer manholes, conduct CCTV of sanitary sewer lines, conduct survey and provide survey report for sanitary sewer structures; and performing all associated work, all in accordance with the Contract Documents A California Class A contractor's license is required to bid this Contract. Joint ventures must secure a joint venture license prior to award of this Contract. No contractor or subcontractor may be listed on a bid proposal or awarded any contract for the project unless registered with the Department of Industrial Relations (DIR) pursuant to Labor Code section 1725.5, with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a). This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. Refer to Document 00200, Instructions to Bidders, for required documents and items to be included in the Bid. The Bid must be submitted in accordance with the provisions of Document 00200, Paragraph 17, Bid Submission. The Port will permit the successful Bidder to substitute securities for retention monies withheld to ensure performance of the contract, as set forth in Document 00680, Escrow Agreement for Security Deposits in Lieu of Retention, in accordance with Section 22300 of the California Public Contract Code. For questions concerning the Port's policy, Connie Ng-Wong at CNg-Wong@portoakland.com or at (510) 627-1390. This project will be covered by the Port's Owner Controlled Insurance Program (OCIP). The OCIP will provide the General Liability, Worker's Compensation, Employer's Liability, and Contractor's Pollution Legal Liability insurance. The OCIP Administrator for the project will be Alliant Insurance Services ("Alliant"). The Contractor will be required to provide Builder's Risk Insurance, Automotive Liability Insurance for Contractor's vehicles and equipment, and other coverages as more specifically described in Article 4, Bonds and Insurance, of Document 00700, General Conditions. A Performance Bond and a Labor and Material Payment Bond are required for this contract. The successful Bidder, whether union or non-union, must comply with the provisions of Document 00823R1, Port of Oakland Maritime and Aviation Project Labor Agreement (MAPLA) [2016] V.1, and must execute Document 00630R1, Letter of Assent [2016] V.1. Non-union Bidders and Bidder's subcontractors are not required to sign union agreements nor are their employees required to become union members to perform work on this project. The Contractor and all subcontractors must pay their employees performing labor under this Contract salaries or wages at least equal to the general prevailing wage rates in effect at the time of advertising for bids, as determined by the Director of the Department of Industrial Relations of the State of California, for the particular crafts, classifications or types of workers employed on the project, subject to compliance with the Port of Oakland Maritime and Aviation Project Labor Agreement (MAPLA). For questions pertaining to the download of the Plans and Project Manual, please contact Bill Russell at (510) 627-1439 or at brussell@portoakland.com. For technical questions, in respect to the Bidding Documents, Bidders should contact Rebecca Perng at rperng@portoakland.com. The Port specifically reserves the right, in its sole discretion, to reject any or all Bids, to re-bid, or to waive inconsequential defects in bidding not involving time, price or quality of the Work. Bidders are solely responsible for the cost of preparing their Bids..

Award

Water / Sewer

$1,593,410.00

Public - City

Site Work

Subscribe For Documents

67 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
163
Active Projects
89
Bidding Soon
1,830
All Active Projects
772
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 7, 2020

February 5, 2021

img_map_placeholder

Multiple Locations, Oakland, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.