BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 20, 2020 at 8:00 PM

Updated September 30, 2025

Site work for a road / highway in Waverley, Nova Scotia. Completed plans call for site work for a road / highway.

This project is located in the communities of Dartmouth and Waverley in the Halifax Regional Municipality on Waverley Road at 2 sites: 1) Near civic 815. 2) Between civics 1948 and 1964. The construction work generally consists of guide rail removal and disposal, tree trimming, embankment widening with surge rock, placement of Type 2 gravel and Type 1S shoulder gravel, new guide rail installation, asphalt swale placement, and other associated reinstatement and incidentals. For bids valued at $100,000 or greater before taxes, the Bidder shall submit with its bid, bid security in the form of an Electronic Bid Bond in an amount not less than 10% of the bid price. No other form of bid security is permitted. If the bid is valued at less than $100,000 before taxes, bid security is not required. If the Contract Price is $50,000 or greater, provide security for performance of the Contract in the form of an Electronic Performance Bond (e-Bond) for 50% of the Contract Price. If the Contract Price is less than $50,000, a Performance Bond is not required. If the Contract Price is $50,000 or greater, provide security for payment of labour and material provided in the performance of the Work in the form of an Electronic Labour and Material Payment Bond (e-Bond) for 50% of the Contract Price. If the Contract Price is less than $50,000, a Labour and Material Payment Bond is not required. The Engineer's representative during the tendering of this project shall be Gary Carpentier., P. Eng., telephone 490-4202, carpeng@halifax.ca. Trade Agreement Atlantic Procurement Agreement (APA) The total duration to complete the Work shall be 15 Working Days regardless of which option the Contractor selects. The time to complete the Substantial Performance of the Work shall be calculated from the order to start work to the day of winter shut down in 2020. The number of days calculated shall resume on the Monday following removal of weight restrictions in 2021.

Award

Roads / Highways

$45,256.00

Public - City

Site Work

4

1

2

3

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
69
Active Projects
39
Bidding Soon
517
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 23, 2020

October 23, 2020

Project location map

Waverley Rd, Waverley, NS


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.