Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published December 1, 2020 at 7:00 PM

Updated September 15, 2023

Demolition, site work, paving and new construction of a bridge / tunnel in Ayer, Massachusetts. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Sealed Bids for the General Contract will be received from General Contractors for construction by Ayer Department of Public Works The work involves replacement of the existing West Main Street bridge structure over the Nonacoicus Brook with a three-sided precast rigid frame, clear span of 28-feet and roadway infrastructure improvements. The bidding and award of this Contract will be under the provisions of M.G.L. Chapter 30, Section 39M. Complete instructions for filing Bids are included in the Instructions to Bidders. All bidders must be pre-qualified by the Massachusetts Department of Transportation The Owner reserves the right to waive any informality in or to reject any or all Bids if deemed to be in its best interest. As of December 1, 2020, the project bid came in above the Town's budget and no general contractor has been selected at this time. The Town is evaluating next steps regarding the bridge replacement project.

Post-Bid

Bridges / Tunnels

$300,000.00

Public - City

Demolition, New Construction, Paving, Site Work

Subscribe For Documents

38 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
869
Active Projects
429
Bidding Soon
5,783
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 7, 2020

January 25, 2021

Project location map

W Main St, Ayer, MA

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed