BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 26, 2025 at 7:00 PM

Updated November 28, 2025

Site work and addition to a detention facility in Napanee, Ontario. Completed plans call for site work for a detention facility; and for the addition of a 122,300-square-foot, one-story above grade, 66-bed detention facility.

https://canada.constructconnect.com/dcn/news/projects/2025/11/rfp-issued-for-quinte-detention-centre-expansion-project NAPANEE, ONT. – Four companies have been invited by Infrastructure Ontario to respond to a request for proposals (RFP) to deliver the Quinte Detention Centre expansion project. The companies were prequalified based on criteria identified in a request for qualifications process that began in October 2024. The prequalified companies are: EBC Inc. EllisDon Corporation Ledcor Projects Eastern Limited Pomerleau Inc. The companies will now begin preparing proposals that detail how they will deliver the project. Once submissions are received, Infrastructure Ontario and the Ministry of the Solicitor General will evaluate the proposals, select a preferred team and then negotiate a final contract, a release reads. The successful company is expected to be announced in summer 2026. The project will include expansions to the following areas: Reception and visitation Executive administration The Institutional Crisis Intervention Team Staff facilities Admitting and discharge Health services and infirmary The project will also include: 91 new beds, bringing the total capacity to over 300 New public and staff entrances Increased female capacity Recreational service areas New parking for staff and visitors The project is being delivered using a design-bid-build model. Key features of this model include increased owner control over the project as well as a high level of flexibility to respond to changing conditions and concerns, the release adds. -------------------------------------------------------------------------------------------------------------- The Project entails a new addition as an expansion to the existing Quinte Detention Centre (QDC) facilities. The QDC is located at 89 Richmond Blvd, Greater Napanee, ON, on a 12 ha 30-acre (12 ha) site. The Project will include a new addition (approximately 122,300 sq ft) as an expansion to the existing QDC facilities. The Quinte Detention Centre (QDC) project will include a new addition (approximately 122,300 sq ft) as an expansion to the existing QDC facilities. To meet the needs of the anticipated inmate population, the QDC expansion will provide 66 new female beds, predominately in double-occupancy cells, consisting of minimum/medium and medium/maximum security housing units, as well as specialized care and health care units. The new addition will also comprise of new program spaces to augment the existing facility: New public and staff entrances, Reception and Visitation, Executive Administration, Institutional Crisis Intervention Team (ICIT) including crisis negotiators, Staff Facilities, Admitting & Discharge, Health Services & Infirmary, Program Services including cultural/spiritual program services, Recreational Services, Female Housing, and new at-grade parking for staff and visitors. Additional scope proposed for the project includes: removal / replacement of existing site services installation of new services including electrical, water, sanitary sewers and storm sewers new at-grade paved parking, landscaping and security fencing demolition of a portion of the existing facility and a few existing out-buildings that are in use and provision of associated temporary facilities to maintain existing QDC operations until the new addition is completed. It is proposed that the QDC expansion will be designed as a separate building with an at-grade connection to the existing QDC facility. New security and life safety systems will be integrated with the existing QDC facility. The project will include expansions to the following areas: - Reception and visitation - Executive administration - Institutional Crisis Intervention Team (ICIT) - Staff facilities - Admitting and discharge - Health services and infirmary The expansion will also include: - 66 new beds, bringing the total capacity to over 300 - New public and staff entrances - Increased female capacity - Recreational service areas - New parking for staff and visitors The RFQ is the first step in the process to select a team to deliver the project. Submissions will be reviewed to shortlist teams with the required construction experience applicable to this project, as well as the financial capacity to deliver a project of this size and complexity. Shortlisted teams will then be invited to respond to a Request for Proposals, which is expected to be released in the summer of 2025. Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform. November 18, 2025 Infrastructure Ontario, on behalf of the Ministry of the Solicitor General, has invited four companies to respond to a request for proposals (RFP) to deliver the Quinte Detention Centre Expansion Project. The companies were prequalified based on criteria identified in a request for qualifications process that began in October 2024. Selection criteria included the required construction experience applicable to this project, as well as the financial capacity to deliver a project of this size and complexity. The prequalified companies are: - EBC Inc. - EllisDon Corporation - Ledcor Projects Eastern Limited - Pomerleau Inc. The companies will now begin preparing proposals that detail how they will deliver the project. Once submissions are received, Infrastructure Ontario and the Ministry of the Solicitor General will evaluate the proposals, select a preferred team and then negotiate a final contract. The successful company is expected to be announced in summer 2026. A fairness monitor will oversee the entire procurement process.

Post-Bid

Jails / Prisons

$42,700,000.00

Public - State/Provincial

Addition, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

16

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
120
Active Projects
63
Bidding Soon
789
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 23, 2025

January 1, 2026

Project location map

89 Richmond Blvd, Napanee, ON


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.