Renovation of a military facility in Camp Lejeune, North Carolina. Completed plans call for the renovation of a military facility.

Only Mechanical MACC Contractors listed on the General Requirements cover page may submit a proposal for this ROICC Camp Lejeune area of responsibility project. Contract Completion Date: 365 days after award Estimated Cost Range: Between $1,000,000 and $5,000,000 Wage Determination: General Decision Number: NC20200038 08/14/2020 Liquidated Damages: $900 per Calendar Day Notes: One person may fill the roles of Superintendent, Quality Control Manager, and Safety and Health Officer, if duly qualified for all three positions as defined in the project specification. Special Scheduling: None Basis for Award: Lowest Price Proposal Acceptance Period: 180 days from receipt of offers Site Visit: TBD Bid bonds are required in accordance with FAR 53.301-24. An electronic copy of your bid bond may be submitted with your proposal. A hard copy of your bid bond must be submitted to the ROICC office within one (1) Calendar day after the due date and time for receipt of proposals. Failure to submit a bid bond by the deadline will result in your proposal being removed from consideration. Payment and/or performance bond(s) will be requested at the time of award per the current process. No bonds are required for proposals less than $35K. Proposals valued at $35K and greater will require a payment bond only. Proposals valued at $150K and greater will require a bid bond, a payment bond, and a performance bond. RFIs must be submitted by the prime contractor to linda.clark1@navy.mil. The cut off for RFIs is Sept 16, 2020 by 2:00 PM EST in order to process all inquiries by the proposal due date.

Post-Bid

Military

$5,000,000.00

Public - Federal

Renovation

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Construction Progress Documentation, Construction Progress Schedule, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Assurance, Quality Control, Temporary Facilities and Controls, Construction Facilities, Temporary Construction, Temporary Controls, Temporary Environmental Controls, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Maintenance Data, Warranties, Spare Parts, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Contaminated Site Material Removal, Facility Remediation, Transportation and Disposal of Hazardous Materials, Asbestos Remediation, Polychlorinate Biphenyl Remediation
Division 03 - Concrete

Division 03 - Concrete

Cast-in-Place Concrete, Specialty Placed Concrete, Concrete Curing
Division 04 - Masonry

Division 04 - Masonry

Masonry, Common Work Results for Masonry, Masonry Mortaring, Unit Masonry, Concrete Unit Masonry
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Joists, Metal Decking, Metal Fabrications, Metal Stairs, Metal Ladders, Metal Railings, Metal Gratings
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Wood Decking, Sheathing, Underlayment
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Dampproofing, Thermal Protection, Thermal Insulation, Exterior Insulation and Finish Systems, Steep Slope Roofing, Shingles and Shakes, Roofing and Siding Panels, Roof and Wall Specialties and Accessories, Roof Accessories, Roof Walkways, Joint Protection, Joint Sealants, Expansion Control
Division 08 - Openings

Division 08 - Openings

Openings, Doors and Frames, Metal Doors and Frames, Windows, Hardware, Door Hardware, Glazing, Glass Glazing, Louvers and Vents, Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Resilient Tile Flooring, Access Flooring, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Directories, Interior Specialties, Partitions, Storage Specialties, Lockers, Exterior Specialties, Protective Covers
Division 11 - Equipment

Division 11 - Equipment

Commercial Equipment, Office Equipment, Computers, Educational and Scientific Equipment, Laboratory Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Portable Lamps, Lamps, Bedroom Furnishings, Blankets, Rugs and Mats, Runners, Furniture, Seating, Chairs, Residential Furniture, Beds
Division 13 - Special Construction

Division 13 - Special Construction

Special Facility Components, Swimming Pools
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts, Other Conveying Equipment, Facility Chutes
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Fire Suppression, Common Work Results for Fire Suppression, General-Duty Valves for Water-Based Fire-Suppression Piping, Hangers and Supports for Fire-Suppression Piping and Equipment, Fire Suppression Systems Insulation, Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Duct Insulation, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, Refrigerant Piping, Refrigerants, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Turning Vanes, HVAC Fans, Air Outlets and Inlets, Central HVAC Equipment, Decentralized HVAC Equipment, Decentralized Unitary HVAC Equipment, Room Air-Conditioners, Convection Heating and Cooling Units, Radiators
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Facility Controls, Integrated Automation Control of Electrical Systems
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Low-Voltage Switchgear, Switchboards and Panelboards, Panelboards, Low-Voltage Circuit Protective Devices, Fuses, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies, Battery Equipment, Batteries, Electrical and Cathodic Protection, Facility Lightning Protection, Lighting, Emergency Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Voice Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Cement and Concrete for Earthwork, Earth Moving, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Common Work Results for Exterior Improvements, Soils for Exterior Improvements, Aggregates for Exterior Improvements, Cement and Concrete for Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Planting, Turf and Grasses, Seeding, Sodding, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Electrical Utilities, Electrical Utility Transmission and Distribution, Utility Substations, Utility Transformers, Site Grounding, Site Lightning Protection
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration, Instrumentation and Control for Process Systems, Process Control Auxiliary Devices
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Bulk Material Processing Equipment, Piece Material Handling Equipment, Cranes and Hoists, Cranes, Mobile Cranes, Lifting Devices, Clamps, Hooks, Lifts
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment, Packaged Water Treatment, Packaged Water Treatment Plants
Division 48 - Electrical Power Generation

Division 48 - Electrical Power Generation

Electrical Power Generation

Find More Local Projects

Within 75 Miles of This Project
48
Active Projects
30
Bidding Soon
479
All Active Projects
187
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 22, 2020

November 23, 2020

img_map_placeholder

To Be Determined, Camp Lejeune, NC

Related To This Project


Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

Redundant CRAC System, HP5

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.