Site work and outdoor lighting for a sidewalk / parking lot in San Clemente, California. Completed plans call for site work for a sidewalk / parking lot; and for outdoor lighting for a sidewalk / parking lot.

Remove and replace the decorative double arm light holders along with the LED lights at the North Beach parking lot. The electrical panel that powers these lights will also be replaced. The work to be done consists of furnishing all materials, equipment, tools, labor and incidentals as required by the plans, specifications and contract documents for the NORTH BEACH ELECTRICAL AND PARKING LOT LIGHTS CITY Project No. 11811, in the City of San Clemente, California. All Bids shall be accompanied by a Bid Bond in an amount not less than 10% of the aggregate of the Proposal for the said amount so payable. If awarded the Contract, the undersigned hereby agrees to sign said Contract and furnish the necessary bonds (100% of the Contract price for Faithful Performance, and 100% of the Contract price for Labor and Materials) within five (5) calendar days after notification of award of the Contract. Q & A deadline - Sep 25, 2020 2.00PM It is understood and agreed that the work under a Contract awarded pursuant to this Bid will be commenced by the undersigned Bidder, if awarded a Contract, within ten (10) calendar days after the date of the Notice to Proceed and will be completed by the Contractor within twenty-five (25) working days from said date of the Notice to Proceed. Failure of the Contractor to complete work within the time allowed will result in damages being sustained by the Agency. Unless otherwise provided, the Contractor will pay to the Agency five hundred dollars ($500.00) for each day of delay in finishing time work in excess of time specified for completion, plus any authorized time extensions, all as provided in Section 6-9 of said Standard Specifications for Public Works Construction. The $500.00 per day liquidated damages provision is not intended to cover actual expenses reasonably and necessarily incurred by the City in retaining other contractors, inspectors, engineering consultants, etc., as a result of any delay by the Contractor. The City of San Clemente reserves the right to reject any or all bids.

Award

Sidewalks / Parking Lot

$151,240.00

Public - City

Outdoor Lighting, Site Work

16

5

Subscribe For Documents

65 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
242
Active Projects
126
Bidding Soon
2,306
All Active Projects
1,094
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 1, 2020

December 1, 2020

img_map_placeholder

To Be Determined, San Clemente, CA


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.