Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
This is a service / maintenance or supply contract in Northport, New York. Contact the soliciting agency for additional information.
Contract Award Date: Sep 24, 2021 Contract Award Number: 36C24221C0214 Task/Delivery Order Number: Contractor Awarded Unique Entity ID (DUNS): 079714686 Contractor Awarded Unique Entity ID (SAM): PNS4XUL1CQ97 Contractor Awarded Name: PETTIT GROUP, LLC, THE Contractor Awarded Address: SEWELL, NJ 08080 JIB Base and All Options Value (Total Contract Value): $472385.63000000 This is a Sources Sought Notice for Sdvosb Architect-engineering Services for a Parking Lot Project. This Announcement is Not a Request for Proposal. The Government Will Not Pay Nor Reimburse Any Costs Associated With Responding to This Request. The Government is Under No Obligation to Award a Contract as a Result of This Announcement. The Department of Veterans Affairs is seeking a qualified Architect-Engineering (AE) firm that specializes in the design of parking lots, pedestrian facilities, curb ramps, and crosswalks, and parking lots (healthcare facilities and campus settings). The AE firm will be required to provide Schematics, Design Development, Construction Documents, Technical Specifications, Construction Period Services, Site Visits, Cost Estimates, As-Built Documentation, and all other related information for Project 632-21-102, Parking Lot Project at the Northport VA Medical Center. This requirement is for the rehabilitation of roadways; parking lots; walkways; curbs, site drainage and other paved areas located in the existing Parking Lot C, as well as the areas of the site which will be vacated once Buildings 1 and 2 have been demolished and the grading restored. This requirement is being procured in accordance with the Brooks Act as implemented in FAR Subpart 36.6. Applicable NAICS code is 541330 (Engineering Services) and small business size standard of $16.5 Million. Magnitude of Construction is between $2,000,000 and $5,000,000. This is a 100% Service-Disabled Veteran-Owned business set-aside. The anticipated award date of the proposed A-E Contract is on or before November 30, 2020. Potential contractors must be registered in SAM (www.sam.gov) and visible/certified in Vet Biz (www.vetbiz.gov) at time of submission of their qualifications in order to be considered for an award. On Project No. 631-21-102 Parking Lot Project, the A/E shall perform a complete survey to the existing conditions and provide recommendation to the VA for review; upon approval the A/E will develop designs and prepare the construction document package with bid alternatives that can be readily identified and listed in the procurement documents; the A/E shall provide construction period services and post-construction services. Estimated Construction Cost Range: Between $2,000,000 and $5,000,000. The Department of Veterans Affairs is contemplating awarding a firm-fixed-price contract. The Department of Veterans Affairs requires design and contract support services. The estimated start and end dates for the design and start and end dates for the construction are as follows: Deliver 50% Schematic Review Material to Contracting Officer not later than 21 days after NTP Review 50% Schematic Review Material with Contracting Officer not later than 62 days after NTP Deliver 100% Schematic Review Material to Contracting Officer not later than 93 days after NTP Review 100% Schematic Review Material with Contracting Officer not later than 114 days after NTP Deliver 50% Design Development Review Material to Contracting Officer not later than 135 days after NTP Review 50% Design Development Review Material with Contracting Officer not later than 156 days after NTP Deliver 100% Design Development Review Material to Contracting Officer not later than 177 days after NTP Review 100% Design Development Review Material with Contracting Officer not later than 198 days after NTP Deliver 50% Construction Document Review Material to Contracting Officer not later than 219 days after NTP Review 50% Construction Document Review Material with Contracting Officer not later than 240 days after NTP Deliver 100% Construction Document Review Material to Contracting Officer not later than 261 days after NTP Review 100% Construction Document Review Material with Contracting Officer not later than 282 days after NTP Deliver Final Bid Documents to Contracting Officer not later than 302 days after NTP The Contracting Officer may schedule additional VA Review(s) should he determine that such review(s) is required for satisfactory completion of the contract. The A/E will be reimbursed for the additional trip(s) in accordance with SP-9 unless the additional VA Review(s) was requested by him or caused by actions for which he is responsible Construction: Number of calendar days to complete construction is to be determined by the AE firm after the design is complete. The method of contractor selection has not been determined at this time.
Award
Roads / Highways
$472,385.00
Public - Federal
Service, Maintenance and Supply
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 12, 2021
79 Middleville Rd, Northport, NY
Related To This Project
Northport, NY
--
Northport, NY
--
Northport, NY
Bid Date: Jul 25 2024
Northport, NY
--
Northport, NY
Bid Date: Aug 15 2024
Northport, NY
--
Northport, NY
--
Northport, NY
Bid Date: Jan 17 2024
Northport, NY
Bid Date: Jan 17 2024
Northport, NY
--
Northport, NY
Bid Date: Dec 19 2023
Northport, NY
--
Northport, NY
--
Northport, NY
Bid Date: Sep 06 2022
Northport, NY
Bid Date: Sep 06 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.