BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 17, 2021 at 8:00 PM

Updated May 29, 2024

Demolition and site work for a water / sewer project in Kalamazoo, Michigan. Completed plans call for the demolition of a water / sewer project; and for site work for a water / sewer project.

Project has been Rebid **This project has been canceled and will rebid at an undetermined date and time** Milham Park Dam Removal final completion shall be May 1, 2021 MOBILIZATION AND SITE PREPARATION- Work shall include tree and miscellaneous structure removal, stockpile/storage area establishment, ongoing maintenance of traffic control signage, and installation and maintenance of safety construction ONSTRUCTION LAYOUT AND STAKING- This item shall consist of furnishing, placing, and maintaining construction layout stakes, including, but not limited to, bankfull stakes, centerline stakes, and structure locations necessary for the proper execution of the work under the contract. SHEET PILE WEIR REMOVAL- This work consists of removing and disposing of the sheet pile weir impounding Portage Creek in Milham Park as indicated in the Construction Drawings. Work shall include weir notching, backwater drawdown, sheet pile removal and disposal, and abutment demolition and debris disposal. - BULK EARTHWORK- The Work covered by this special provision consists of all items related to bulk excavation, transport, stockpile, and fill within the proposed channel and floodplain areas. Topsoil harvest and stockpile, and harvest and stockpile of native channel materials is included in item, as is export of excess cut is incidental to this item BRUSH TOE- rush Toe is a bank stabilization structure intended to resist erosion in the active channel and support the reconstructed bank above. This item includes furnishing all materials, equipment, and labor for installing the Brush Toe structure as shown in the Construction Drawings or as directed by the Engineer. Overexcavation for structure installation is incidental to this item. Bid Result- Bid WITH Prevailing Wages Hoffman Bros., Inc 453,698 Bid Without Prevailing Wages Taplin Enterprise $486,930 Bid Reference #: 95939-002.0

Award

Water / Sewer

$381,200.00

Public - City

Demolition, Site Work

17

1

7

5

Subscribe For Documents

81 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
221
Active Projects
153
Bidding Soon
1,408
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 14, 2021

May 14, 2021

Project location map

To Be Determined, Kalamazoo, MI

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.