Site work for a civil project in Pearland, Texas. Completed plans call for site work for a water / sewer project.

The work consists of providing the necessary labor, materials, equipment, supervision, and plant to construct Water Plant Improvements 2020 for Brazoria County Municipal Utility District No. 2 on behalf of Brazoria County Municipal Utility District Nos. 2, 3, 6 & The City of Pearland. Water Plant No. 1: The work includes, but is not limited to, touch-up coating the Ground Storage Tank No. 1 roof vent; blasting and recoating the Hydropneumatic Tank No. 1 interior; touch-up coating the Hydropneumatic Tank No. 1 saddle foundation; blasting and recoating the Hydropneumatic Tank No. 2 interior; recoating the Hydropneumatic Tank No. 2 air equalizer piping; re-grading the area around the Hydropneumatic Tanks Nos. 1 & 2; applying protective coatings to the Water Well No. 1 air release valve; touch-up coating the light pole and light pole base; and touch-up coating the booster pumps pipe support. Water Plant No. 2: the work includes, but is not limited to, touch-up coating the Ground Storage Tank No. 1 exterior; demolishing and replacing the Ground Storage Tank No. 1 overflow weir hatch; brushing, cleaning, and galvanizing a conduit body at the exterior ladder of Ground Storage Tank No. 1; touch-up coating the Ground Storage Tank No. 2 interior, overflow weir box, interior ladder, and roof rafters; touch-up coating the Ground Storage Tank No. 2 exterior, hatch covers, level transducer flange, manway cover davit arm, and piping; touch-up coating the Ground Storage Tank No. 3 exterior; touch-up coating the Hydropneumatic Tank No. 1 drain line flange cover; touch-up coating the Hydropneumatic Tank No. 1 saddle foundation; touch-up coating the Hydropneumatic Tank No. 2 fill line flanges; touch-up coating the Hydropneumatic Tank No. 2 saddle foundation; touch-up coating the Water Well No. 2 pump head; touch-up coating the Water Well No. 2 motor support; coating the Water Well No. 2 air release valve; touch-up coating the generator conduit fittings and enclosure; and touch-up coating the confined space cover. Water Plant No. 3: the work includes, but is not limited to, repairing the generator enclosure with a welded steel patch; touch-up coating the booster pumps; touch-up coating the booster pump air release valve; touch-up coating the Elevated Storage Tank interior and roof rafters; touch-up coating the Elevated Storage Tank flap valve and altitude valve; repairing the Elevated Storage Tank altitude valve; replacing the Elevated Storage Tank roof hatch hinge; replacing the Elevated Storage Tank interior fall protection; wire brushing, cleaning, pickling, and passivating the Elevated Storage Tank piping; draining and disinfecting Ground Storage Tank No. 1; touch-up coating the Ground Storage Tank No. 1 discharge line flanges, roof vent, overflow weir box, and interior ladder; draining and disinfecting Ground Storage Tank No. 2; touch-up coating the Ground Storage Tank No. 2 interior roof rafters and skimmer plate; touch-up coating the Ground Storage Tank No. 2 roof access hatch, overflow weir box, overflow piping, interior ladder, and ultrasonic transducer flange; capping the injection saddle on the fill line for Ground Storage Tank No. 2; replacing the Ground Storage Tank No. 2 safety rail and clamp supports; touch-up coating the Water Well No. 1 discharge head, air release valve, flow meter, and discharge piping; applying additional plastic wrap and Winmore tape to gate valves at Water Well No. 1; touch-up coating the Hydropneumatic Tank opening; applying a protective coating to the Hydropnuematic Tank conduit connections; touch-up coating the booster pump in the Chlorine Room; and providing a direct ground path from the RF surge protector to the system ground. Water Plant No. 4: the work includes, but is not limited to, breaking out the cracked concrete and replace the grout at the splash block for Ground Storage Tank No. 1; touch-up coating the Ground Storage Tank No. 1 ladder access hatch cover; and repairing or replacing the chlorine room door closer. Remote Water Well No. 3: the work includes, but is not limited to, touch-up coating the Water Well No. 3 discharge piping and recoating the Water Well No. 3 check valve. Remote Water Well No. 5: the work includes, but is not limited to, touch-up coating the Water Well No. 5 air release assembly; demolishing, and replacing the existing polyphosphate building and foundation with a CMU building with new concrete foundation; relocating and reinstalling the existing polyphosphate equipment into the new polyphosphate building; demolition and replacement of an underground duct bank; electrical modifications in the control building; and installation of a lighting panel and conduit in the prop polyphosphate building. Site Locations Water Plant No. 1: 3700 Northfork Drive, Pearland, Texas 77584 Water Plant No. 2: 3110 Morgan Road, Pearland, Texas 77584 Water Plant No. 3: 3006 Summercrest Drive, Pearland, Texas 77584 Water Plant No. 4: 3133 1/2 County Road 922, Pearland, Texas 77584 Remote Water Well No. 3: 3303 Stonehurst Court, Pearland, Texas 77584 Remote Water Well No. 5: 2230 County Road 101, Pearland, Texas 77584

Bid Results

Water / Sewer

$136,296.00

Public - County

Site Work

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
332
Active Projects
219
Bidding Soon
4,218
All Active Projects
1,766
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.