BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Ann Arbor, Michigan. Completed plans call for site work for a water / sewer project.

Question Acceptance Deadline: 09/24/2020 03:00 PM EDT Questions are submitted online: No The Contractor shall begin the work of this project on or before December 15, 2020, Final Completion date of June 30, 2021 Scheduling and organization of all work, subcontractors, suppliers, testing, inspection, surveying, and staking Placing, maintaining, and removing all soil erosion and sedimentation controls, including stone inlets filer Maintaining driveways drive openings, sidewalks, bike paths, mail deliveries, and solid waste/recycle pick-ups. This includes the placement and maintenance of gravel in driveway openings as directed by the Engineer Storing all materials and equipment off lawn areas Temporary relocation and final replacement/re-setting of mailboxes The audio-visual filming shall be: 1. Of professional quality, providing a clear and accurate audio and visual record of existing conditions. 2. Prepared within the four (4) week period immediately prior to the start of construction 3. Furnished to the Engineer a minimum of one (1) week prior to bringing any materials or equipment within the areas described in this Detailed Specification. 4. Carried-out under the supervision of the Engineer. The furnishing and operating of miscellaneous signs, warning devices, traffic regulators, flags, paddles, and cones; This work shall consist of protecting and maintaining vehicular and pedestrian traffic in accordance with Sections 140.11, 812, and 922 of the Michigan Department of Transportation (MDOT) 2012 Standard Specifications for Construction; Part 6 of the 2011 Edition of the Michigan Manual of Uniform Traffic Control Devices (MMUTCD); and the City of Ann Arbor Standard Specifications for Construction, except as modified herein Sewer Televising and Cleaning Cured-In-Place Pipe (CIPP) Lining Onsite Superintendent/Foreman

Award

Water / Sewer

$3,582,585.00

Public - City

Site Work

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
155
Active Projects
78
Bidding Soon
1,403
All Active Projects
575
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 13, 2020

December 15, 2020

img_map_placeholder

To Be Determined, Ann Arbor, MI


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.