Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Ann Arbor, Michigan. Completed plans call for site work for a water / sewer project.
Question Acceptance Deadline: 09/24/2020 03:00 PM EDT Questions are submitted online: No The Contractor shall begin the work of this project on or before December 15, 2020, Final Completion date of June 30, 2021 Scheduling and organization of all work, subcontractors, suppliers, testing, inspection, surveying, and staking Placing, maintaining, and removing all soil erosion and sedimentation controls, including stone inlets filer Maintaining driveways drive openings, sidewalks, bike paths, mail deliveries, and solid waste/recycle pick-ups. This includes the placement and maintenance of gravel in driveway openings as directed by the Engineer Storing all materials and equipment off lawn areas Temporary relocation and final replacement/re-setting of mailboxes The audio-visual filming shall be: 1. Of professional quality, providing a clear and accurate audio and visual record of existing conditions. 2. Prepared within the four (4) week period immediately prior to the start of construction 3. Furnished to the Engineer a minimum of one (1) week prior to bringing any materials or equipment within the areas described in this Detailed Specification. 4. Carried-out under the supervision of the Engineer. The furnishing and operating of miscellaneous signs, warning devices, traffic regulators, flags, paddles, and cones; This work shall consist of protecting and maintaining vehicular and pedestrian traffic in accordance with Sections 140.11, 812, and 922 of the Michigan Department of Transportation (MDOT) 2012 Standard Specifications for Construction; Part 6 of the 2011 Edition of the Michigan Manual of Uniform Traffic Control Devices (MMUTCD); and the City of Ann Arbor Standard Specifications for Construction, except as modified herein Sewer Televising and Cleaning Cured-In-Place Pipe (CIPP) Lining Onsite Superintendent/Foreman
Award
Water / Sewer
$3,582,585.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 13, 2020
December 15, 2020
To Be Determined, Ann Arbor, MI
Related To This Project
Ann Arbor, MI
Bid Date: Jan 05 2021
Ann Arbor, MI
Bid Date: Apr 15 2021
Ann Arbor, MI
--
Ann Arbor, MI
Bid Date: Jul 27 2023
Ann Arbor, MI
Bid Date: Aug 15 2023
Ann Arbor, MI
Bid Date: Aug 29 2023
Ann Arbor, MI
Bid Date: Jun 15 2021
Ann Arbor, MI
Bid Date: Aug 10 2021
Ann Arbor, MI
Bid Date: Oct 20 2021
Ann Arbor, MI
Bid Date: Jul 25 2023
Ann Arbor, MI
Bid Date: Jul 25 2023
Ann Arbor, MI
Bid Date: Aug 15 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.