BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 26, 2026 at 7:00 PM

Updated February 27, 2026

Site work and new construction of an educational facility in Missoula, Montana. Design plans call for the construction of a educational facility.

New construction of modern laboratory and active learning spaces. The Forestry program will be housed in the new building. As of February 26, 2026, design is in progress for this project. Cushing Terrell is serving as the architect as well as the structural and MEP engineer. Plans and specifications have not yet been issued, and a general contractor has not been selected. Bidding is anticipated around November–December 2026.

Design

Educational

$52,000,000.00

Public - State/Provincial

New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
3
Active Projects
0
Bidding Soon
87
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 25, 2027

Project location map

32 Campus Dr, Missoula, MT

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.