BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a municipal facility in Baldwin, Louisiana. Completed plans call for the construction of a municipal facility; and for site work for a municipal facility.

The project consists of the construction of a new training facility including all site work and parking. Prospective Contractors shall be licensed for Building Construction by the State of Louisiana and that license shall be in effect on the date of the bid. Each proposal must be accompanied by a bid bond in an amount equal to at least five percent (5%) of the amount bid, made payable without condition to the Owner as a guarantee that the bidder, if awarded the contract, will promptly execute the contract documents. Failure to do so will result in the bid/bids being declared nonresponsive and shall be cause for rejection. If a bid bond is provided it shall be on the attached form and only on the attached form and shall be dated on or before the bid date. The bid security of all bidders, except the three lowest, will be returned promptly after the canvas of bids. Contractors and Material Dealers may obtain additional sets of plans and specifications by making a deposit in the amount named above. Upon return of these documents, in good condition, one half of the deposit will be refunded, the difference representing the cost of printing, assembling, and distributing the sets. No refund will be made on any set not returned in good condition within ten (10) days after the receipt of bids. If someone other than a corporate officer signs for the Bidder/Contractor, a copy of a corporate resolution or other signature authorization shall be required for submission of bid. Failure to include a copy of the appropriate signature authorization, if required, may result in the rejection of the bid unless bidder has complied with LA R.S. 38:22:12(A)(1)(C) or LA R.S. 38:22:12(0). A bid will be considered responsive if it conforms in all respects with the conditions and requirements of the Bidding Documents. In order to be considered responsive, the Louisiana Uniform Public Works Bid Form must: (a) be fully completed, signed and be responsive in all respects to the Bidding Documents; (b) be made on the Bid Forms provided and submitted intact, (c) submitted in ink. No bid may be withdrawn after the scheduled closing time for receipt of bids for thirty (30) days. To the extent permitted by applicable state and federal laws and regulations, the West St. Mary Parish, Port, Harbor, and Terminal District reserves the right to reject any and/or proposals for just cause.

Award

Municipal

$1,097,500.00

Public - County

New Construction, Site Work

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
25
Active Projects
13
Bidding Soon
291
All Active Projects
111
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 15, 2020

November 16, 2020

img_map_placeholder

150 Gordy Rd, Baldwin, LA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.