BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Coachella, California. Completed plans call for the renovation of a clubhouse / community center.

a. Remove all loose dust and debris and haul away. b. Buckles, blisters, fish mouths will be cut our of fastened. c. Remove soft asphalt, mastic, oils, solvents, grease, loose particles, loose coating or any other foreign matter that may deplete the new roof system. d. Grind loose paint from all Z-Bar and counter flashing as needed to allow good adhesion. e. Provide new pipe, ensure all roof drains function, and vent flashings as needed; make any repairs needed to existing roof drains, flashing. f. Inspect for dry-rot, any found will be replaced with needed sheathing. g. Any plumbing, electrical, framing and/or mechanical equipment modifications will be completed. h. Re-roof will be completed using a spray polyurethane foam application at a thickness of at least one inch and density of 3.0; application will be at least one gallon per 100 square feet. Application will meet ASTM and California Building Code Standards. i. Polyurethane foam shall be applied uniformly over entire roof surface, ensuring existing drains/utilities are left visible. Ensure all roof slopes are maintained after application. j. Additional foam will be added to ponding area to eliminate ponding conditions. k. The Polyurethane Roofing application will be installed by a trained and certified technician. l. Prior to application of protective coating the polyurethane foam shall be inspected for suitable base coat application. The polyurethane foam shall be clean, dry and sound. m. Polyurethane foam shall be given proper time to cure as per manufacturer standards and be free from dust, dirt, contaminants, moisture and other materials that will impair adhesion on the protective coating. n. Over entire new polyurethane foam roof system apply multiple coats of ThermoFlex 1000 high solids, elastomeric roof coating for a total thickness of 28-30 dry mils; as per manufacturer standards and ASTM Standards for Polyurethane Foam Re-Roof Application. o. Coat must be manufactured using 100% acrylic resins, coating is a water based, non-toxic roof coating, fire rated and UV resistant. p. All roof coating will be installed by a trained and certified technician. q. Contractor will remove all masking, overspray materials, and all trash from jobsite once complete. This contract will be for a sixty-day (60) period after notice to proceed. Work will commence one day after notice to proceed is given Requests for clarifications, questions and comments must be clearly labeled, Written Questions and addressed to Maritza Martinez, City of Coachella, Public Works Department. The City is not responsible for failure to respond to a request that has not been labeled as such. All questions must be emailed to Maritza Martinez at mmartinez@coachella.org and be received no later than 5:00 p.m. on Thursday, October 1, 2020. The AGENCY reserves the right to reject any or all proposals, to waive any irregularity, to accept any bid or portion thereof, and to take all proposals under advisement for a period of ninety (90) days. At the time of contract award, the prime contractor shall possess the appropriate contractors license. All licenses must be in good standing for the previous three (3) consecutive years without any official unresolved record of complaints registered of filed with the California Department of Consumer Affairs. Questions pertaining to the technical aspects of the contract should be directed to Maritza Martinez (760) 501-8111 or mmartinez@coachella.org

Award

Clubhouse / Community Centers

$149,729.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
91
Active Projects
58
Bidding Soon
770
All Active Projects
374
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 7, 2020

November 6, 2020

img_map_placeholder

Multiple Locations, Coachella, CA


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.