BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 30, 2022 at 8:00 PM

Updated September 15, 2023

Renovation of a municipal facility in Arlington, Tennessee. Completed plans call for the renovation of a municipal facility.

Project consists of erection of new elevator pit, shaft, cab, and all related work. The Project consists of erection of new elevator pit, shaft, cab, and all related work. Location of new elevator is in the lobby area that is open to the 2 nd floor above. After installation of new elevator, the existing elevator cab and all associated mechanical and electrical systems shall be removed. Space where elevator removed shall be finished to match existing finishes and utilized.

Award

Municipal

$342,000.00

Public - State/Provincial

Renovation

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
104
Active Projects
59
Bidding Soon
694
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.