Published December 2, 2020 at 7:00 PM

Updated November 14, 2023

Site work and paving for a road / highway in Franklin, Louisiana. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The Contract Documents (Plans, Information for Bidders, Bid Form, Specifications and other pertinent documents) may be examined at the following locations: * Miller Engineers & Associates, Inc. - 601 Main Street; Franklin, Louisiana 70538 * St. Mary Parish Purchasing Agent's Office - Fifth Floor, Courthouse Building; Franklin, Louisiana 70538 In accordance with La. R.S. 38:2212 A (1) (e), deposits on the first set of documents furnished bona fide prime bidders will be fully refunded upon return of the documents and deposits on any additional sets will be refunded less the actual cost of reproduction. Refunds will be made upon return of the documents unmarked and in good condition if within ten days after receipt of bids. Official bid documents can be downloaded Electronically To qualify to bid, each bidder shall be a properly licensed Contractor in accordance with La. R.S. 37:2150 - 2163 for the classification of HIGHWAY, STREET & BRIDGE CONSTRUCTION or related classification. The Owner reserves the right to reject any and all bids in accordance with Title 38 of the Louisiana Revised Statutes. Each bidder must deposit with his/her bid, security in the amount, form and subject to the conditions provided in the Information for Bidders. Sureties used for obtaining bonds must appear as acceptable on the U.S. Department of Treasury Circular 570. A bidder may withdraw their bid within forty-eight (48) hours of the bid opening, excluding Saturdays, Sundays and legal holidays as governed by La. R.S. 38:2214 (C). Any questions or clarifications shall be submitted to the Project Engineer, Jules M. Darden, in writing a minimum of five (5) days prior to the bid opening date. Addenda will be issued to all prospective bidders a minimum of 48 hours prior to the bid opening date. Only information provided within written addenda issued by the Project Engineer shall be considered binding. Any person with disabilities requiring special accommodations must contact the St. Mary Parish Government no later than seven (7) days prior to the bid opening. The Work will be substantially completed within 60 working days after the date when the Contract Thues commence to run as provided in Paragraph 2.03 of the General Conditions, and completed and ready for final payment in accordance with Paragraph 14.07 of the General Conditions within 90 working days after the date when the Contract Times commence to run. Contractor shall furnish performance and payment bonds, each in an amount at least equal to the Contract Price as security for the faithful performance and payment of all of Contractor's obligations under the Contract Documents. These bonds shall remain in effect until one year after the date when final payment becomes due or until completion of the correction period specified in Paragraph 13.07, whichever is later, except as provided otherwise by Laws or Regulations or by the Contract Documents. Contractor shall also furnish such other bonds as are required by the Contract Documents.

Award

Roads / Highways

$1,067,066.00

Public - County

Paving, Site Work

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Unit Prices, Payment Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Bonds
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 08 - Openings

Division 08 - Openings

Glazing, Glass Glazing
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage
Division 26 - Electrical

Division 26 - Electrical

Lighting
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Fill, Backfill, Compaction, Embankments
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Cold Milling Asphalt Paving, Common Work Results for Exterior Improvements, Soils for Exterior Improvements, Aggregates for Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Cement-Treated Base Courses, Flexible Paving, Preparatory Coats, Asphalt Paving, Aggregate Surfacing, Curbs and Gutters, Paving Specialties, Pavement Markings, Planting

Find More Local Projects

Within 75 Miles of This Project
46
Active Projects
19
Bidding Soon
323
All Active Projects
153
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 14, 2020

December 14, 2020

img_map_placeholder

Multiple Locations, Franklin, LA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.