Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of an educational facility in Carson, California. Conceptual plans call for the renovation of a educational facility.
Gym and Field House Replacement This project will renovate a total of 57,000 ASF/79,400 GSF in the Gymnasium (#60) and Field House (#61). The buildings were constructed in the 1970s and are in need of building systems and equipment upgrades. This project will upgrade building mechanical, electrical, and plumbing systems, correct accessibility deficiencies, and replace aging equipment. Programmatic upgrades in the Gymnasium would include renovation of existing multi-purpose spaces, dance studios, kinesiology training rooms, storage space, and other select program spaces. This project will result in a gain of 40 FTE in lecture space. This project is currently in the California State University's FY 2022-2026 CIP. As of March 23, 2022, preliminary plans, working drawings and construction are anticipated in 2023/2024.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Educational
$88,253,000.00
Public - State/Provincial
Renovation
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 27, 2023
1000 E Victoria St, Carson, CA
Related To This Project
Carson, CA
Bid Date: Feb 10 2022
Carson, CA
Bid Date: Aug 28 2020
Carson, CA
Bid Date: Aug 08 2022
Carson, CA
--
Carson, CA
Bid Date: Oct 19 2021
Carson, CA
Bid Date: Jan 14 2022
Carson, CA
Bid Date: Feb 24 2022
Carson, CA
Bid Date: Mar 04 2022
Carson, CA
Bid Date: Feb 23 2022
Carson, CA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.