BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a water / sewer project in Pittsburgh, Pennsylvania. Completed plans call for the renovation of a water / sewer project.

Demolish and legally dispose of the existing boiler, gas train, flue pipe, compression tank, control/power wiring, system fluid, and related accessories. Furnish and install new City of Pittsburgh code compliant backflow preventer and makeup water valves. Furnish and install new main power feed disconnect switch. Furnish and install new emergency power off switch adjacent to the boiler room entrance door. Replace existing recirculation pump and flow control valves Install new fresh air intake and flue vent with rain cap. Necessary flashing for penetrations Furnish and install new standalone controls compatible with the selected boiler, CSD-1 PA code compliant. Controls shall have additional dry contacts be capable of sending an alarm signal for remote monitoring. Wiring for the alarm is not part of this scope of work and will be completed by others. Furnish and install new expansion tank and piping. Furnish and install new natural gas fired hot water boiler equal to the existing Teledyne Laars boiler: Model 88100 Input 625,000 BTU/HR Output 487,000 BTU/HR Furnish and install (excluding makeup water) all required chemicals for initial charge of the hot water loop system. Hydrostatically leak test the piping once the installation is complete. Provide a manufacturer trained technician to complete startup of the new boiler system and train PWSA personnel in the operation of the new boiler. Provide boiler certificate of operation and applicable City of Pittsburgh permits if required. Provide one service call for operational inspection 90 days after the boiler is in operation. Include in proposal an allowance for the repair of potential leaks in the loop piping outside of the boiler room. (See bid form for allowance amount. If the allowance is not used the cost will not be billed for as part of the work for this project.) Minimum two (2) year warranty on all parts and labor, also to include one annual service call prior to the start of the following years heating season. Pricing shall be included with price for new boiler. Optional add for extending the warranty three (3) additional years also to include one annual service call per year prior to the start of the heating season for a total of five (5) years of warranty coverage It is the intent of the PWSA to establish a contract to perform/provide removal and disposal of the existing natural gas fired hot water boiler and accessory components as well as furnish and install a new natural gas fired hot water boiler with all required accessory components and controls services/material.he Contractor shall provide all labor, material, equipment, tools, and appurtenances necessary in order to complete the scope of work required. Questions Due Date: September 28, 2020 by 4:00 p.m. BID BOND REQUIREMENTS-N/A PERFORMANCE BOND REQUIREMENT -N/A The PWSA's current goal for Minority Business Enterprise ("MBE"), Women Business Enterprise ("WBE"), Disadvantaged Small Business Enterprise ("DBE"), Small BusinessEnterprises ("SBE") and Veteran Business Enterprise ("VBE")/Service Disabled-Veteran Business Enterprises ("SDVBE") participation is between ten percent (10%) to twenty-five percent (25%) of the total dollar value of the PWSA's contracts.

Award

Water / Sewer

$31,300.00

Public - City

Renovation

1

2

9

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
83
Active Projects
39
Bidding Soon
774
All Active Projects
295
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 2, 2020

November 2, 2020

img_map_placeholder

900 Freeport Rd, Pittsburgh, PA

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.