BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 23, 2020 at 8:00 PM

Updated January 25, 2024

Site work, paving and renovation of a civil project in Manchester, New Hampshire. Completed plans call for site work for a water / sewer project; for the renovation of a water / sewer project; road / highway; and for paving for a road / highway.

The City of Manchester is seeking prequalification statements from construction contractors for two separate largescale pipeline projects: the Cohas Brook Sewer Project, Contract 4 The projects are scheduled to begin construction in winter 2020/2021 and spring 2021 respectively. The Cohas Brook Sewer Project, Contract 4 includes construction of new sewers in southeast Manchester, including approximately 10,800 feet of new 24-inch sanitary sewer and 7,500 feet of new 8-inch sanitary sewer in Sunset Pine Drive, Bodwell Road, Pheasant Lane and cross-country areas at depths up to 27 feet, appurtenances, roadway reconstruction of affected streets, and restoration of private property. The work also includes abandonment/removal of up to five (5) sewer pumping stations and abandonment/removal of approximately 9,600 feet of associated 4-inch to 8- inch force main. Construction duration is 675 calendar days for substantial completion and 900 calendar days for final completion. Construction contractors with extensive experience in sanitary and storm drain construction projects of a similar size and scope are invited to submit prequalification statements for bidding on the City of Manchesters Cohas Brook Sewer Project Prequalification forms for construction contractors may be obtained from Kleinfelder by contacting Ian Gervais at IGervais@kleinfelder.com. Questions regarding the pre-qualification forms may also be directed to Ian Gervais at the email address above or at (603) 227-2304. The bid opening for Cohas Brook Sewer Project, Contract 4 is expected to occur in late fall of 2020 and the bid opening for Christian Brook Sewer Separation Project, Contract 1 is expected to occur in spring 2021. Mandatory pre bid conferences will be held separately for each project approximately two weeks prior to bid opening. The right is reserved to waive any informalities in or reject any or all prequalifying Contractors and to accept prequalified Contractors that are deemed most favorable to the interest of the City of Manchester.

Post-Bid

Roads / Highways

$300,000.00

Public - City

Paving, Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
664
Active Projects
400
Bidding Soon
4,615
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 16, 2020

November 16, 2020

Project location map

To Be Determined, Manchester, NH


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.