Find the next project before your competition does.

See pricing

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 11, 2021 at 8:00 PM

Updated January 25, 2024

Site work and paving for a civil project in Manchester, New Hampshire. Completed plans call for site work for a road / highway; water / sewer project; and for paving for a road / highway.

The prequalification of contractors will not be finalized until early 2021. The City of Manchester is seeking prequalification statements from construction contractors for two separate largescale pipeline projects: the Christian Brook Sewer Separation Project, Contract 1. The projects are scheduled to begin construction in winter 2020/2021 and spring 2021 respectively. The Christian Brook Sewer Separation Project, Contract 1 includes construction of approximately one mile of reinforced concrete storm drain, including approximately 1,100 feet of 60-inch storm drain, 500 feet of 48-inch storm drain, 3,000 feet of 42-inch storm drain, and 200 feet of 24-inch storm drain at depths in the range of 12 to 22 feet. The project also includes installation of 24, 5-foot to 8-foot diameter precast manholes, reconfiguration of two existing CSO regulators and installation of new catch basins with four-foot sumps along the project corridor. Pavement restoration will consist of full depth roadway reconstruction. The project is expected to involve ledge removal and groundwater dewatering. Construction duration is approximately two years for final completion. Construction contractors with extensive experience in sanitary and storm drain construction projects of a similar size and scope are invited to submit prequalification statements for bidding on the Christian Brook Sewer Separation Project, Contract 1. Prequalification forms for construction contractors may be obtained from Kleinfelder by contacting Ian Gervais at IGervais@kleinfelder.com. Questions regarding the pre-qualification forms may also be directed to Ian Gervais at the email address above or at (603) 227-2304. The bid opening for Cohas Brook Sewer Project, Contract 4 is expected to occur in late fall of 2020 and the bid opening for Christian Brook Sewer Separation Project, Contract 1 is expected to occur in spring 2021. The right is reserved to waive any informalities in or reject any or all prequalifying Contractors and to accept prequalified Contractors that are deemed most favorable to the interest of the City of Manchester.

Post-Bid

Roads / Highways

$300,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
654
Active Projects
260
Bidding Soon
4,533
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 16, 2020

October 18, 2021

Project location map

To Be Determined, Manchester, NH


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed