BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 21, 2022 at 8:00 PM

Updated September 15, 2023

Renovation of an educational facility in La Crosse, Wisconsin. Design plans call for the renovation of a educational facility.

https://wisbuild.doa.state.wi.us/dfd/dfd_reports/selcom-agenda_past.asp 10. Graff Main Hall HVAC System Renovation UNIVERSITY OF WISCONSIN - LA CROSSE CAMPUS This project replaces all of the outdated, worn out, and under-performing equipment in Graff Main Hall and installs a new variable air volume system with reheat and variable-air-volume terminal units. Existing ductwork and equipment that is functionally adequate will be cleaned, repaired, and returned to service. The scope will include replacement of two air handling units and twelve existing exhaust fans with eight new exhaust fans; installation of a new central hot water heating system, new variable frequency drives, and motor starters; improvements in cooling for data and telecommunication rooms; and updated ventilation and controls. The following summary is the construction cost portion for the proposed scope of work. Selected Firm: Indoor Air Quality Diagnostics, Inc. - Wauwatosa _________________________________ As of March 12, 2021, an engineer has been selected and this project is in the design phase. Although a firm timeline for construction has not been determined, construction is expected to start in March 2023. *The closed solicitation has been included below for reference: This project replaces all of the outdated, worn out, and under-performing equipment in Graff Main Hall and installs a new variable air volume system with reheat and variable-air-volume terminal units. Existing ductwork and equipment that is functionally adequate will be cleaned, repaired, and returned to service. The scope will include replacement of two air handling units and twelve existing exhaust fans with eight new exhaust fans; installation of a new central hot water heating system, new variable frequency drives, and motor starters; improvements in cooling for data and telecommunication rooms; updated ventilation and controls; and sprinkler system retrofit through the facility. Project Schedule A/E Selection: Nov 2020 Design Report: Jan 2022 Approval: Mar 2022 Bid Date: Jan 2023 Start Project: Mar 2023 Substantial Completion: Dec 2024 Project Close Out: Jun 2025 *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Design

Educational

$10,639,000.00

Public - State/Provincial

Renovation

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
85
Active Projects
58
Bidding Soon
516
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2023

Project location map

1725 State St, La Crosse, WI


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.