Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a mixed-use development in Minneapolis, Minnesota. Completed plans call for the renovation of a educational facility; and 30,000-square-foot laboratory facility.
The Lind Hall Projectinvolves demolition and renovation of approximately 30,000 gsf of the existing Moos Tower 1st floor ( 2,000 gsf) and 3rd floor ( 20,000 gsf) Hall building for the University of Minnesota, Medical School located on the Minneapolis East Bank Campus for a total project budget of $33,000,000. Level 3 will be extensively remodeled, with the exception of the public hallway and escalator areas on the west side, to become primarily open lab benches, lab support spaces, and investigators' offices. The third-floor toilet rooms will be replaced in their entirety. The remodeling on Level 1 will be more selective to provide small supportspaces for animal testing and the remainder of the office program. The project will also replace deficient infrastructure as prescribed in an earlier 2020 Infrastructure Report. Upgrades to be included in the base scope are: 1. The replacement of impacted exhaust fans. 2. The replacement of impacted supply and return fans, including the replacement of the associated cooling coils, heating coils, humidifiers, and new DDC controls. 3 Modifying hazardous exhaust and control areas on level 3 to current Code. A new rated duct shaft will be installed to accommodate the fume hood exhaust ducts to level 10 roof. A second shaft will extend from level 10 roof to the high roof. 4 Replacement of third floor public toilets. Total Project Cost: $34,000,000 (includes all soft costs and construction costs) Construction cost estimate (SD): $24,300,000. Schematic Design & Cost Estimating: July 2021-November 2021 Design Development: December 2021-March 2022 Construction Documents: April 2022-July 2022 Construction: January 2023 - March 2024.
Post-Bid
Laboratories
$24,300,000.00
Public - State/Provincial
Renovation
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 21, 2021
August 22, 2022
515 Delaware St SE, Minneapolis, MN
Related To This Project
Minneapolis, MN
Bid Date: Nov 18 2021
Minneapolis, MN
--
Minneapolis, MN
--
Minneapolis, MN
--
Minneapolis, MN
Bid Date: Jan 10 2022
Minneapolis, MN
Bid Date: Dec 07 2021
Minneapolis, MN
Bid Date: Jan 06 2022
Minneapolis, MN
--
Minneapolis, MN
Bid Date: Aug 25 2021
Minneapolis, MN
Bid Date: Dec 01 2021
Minneapolis, MN
Bid Date: Jan 13 2022
Minneapolis, MN
Bid Date: Jan 06 2022
Minneapolis, MN
--
Minneapolis, MN
Bid Date: Jan 14 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.