BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Minneapolis, Minnesota. Completed plans call for the renovation of a educational facility; and 30,000-square-foot laboratory facility.

The Lind Hall Projectinvolves demolition and renovation of approximately 30,000 gsf of the existing Moos Tower 1st floor ( 2,000 gsf) and 3rd floor ( 20,000 gsf) Hall building for the University of Minnesota, Medical School located on the Minneapolis East Bank Campus for a total project budget of $33,000,000. Level 3 will be extensively remodeled, with the exception of the public hallway and escalator areas on the west side, to become primarily open lab benches, lab support spaces, and investigators' offices. The third-floor toilet rooms will be replaced in their entirety. The remodeling on Level 1 will be more selective to provide small supportspaces for animal testing and the remainder of the office program. The project will also replace deficient infrastructure as prescribed in an earlier 2020 Infrastructure Report. Upgrades to be included in the base scope are: 1. The replacement of impacted exhaust fans. 2. The replacement of impacted supply and return fans, including the replacement of the associated cooling coils, heating coils, humidifiers, and new DDC controls. 3 Modifying hazardous exhaust and control areas on level 3 to current Code. A new rated duct shaft will be installed to accommodate the fume hood exhaust ducts to level 10 roof. A second shaft will extend from level 10 roof to the high roof. 4 Replacement of third floor public toilets. Total Project Cost: $34,000,000 (includes all soft costs and construction costs) Construction cost estimate (SD): $24,300,000. Schematic Design & Cost Estimating: July 2021-November 2021 Design Development: December 2021-March 2022 Construction Documents: April 2022-July 2022 Construction: January 2023 - March 2024.

Post-Bid

Laboratories

$24,300,000.00

Public - State/Provincial

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
121
Active Projects
82
Bidding Soon
781
All Active Projects
316
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 21, 2021

August 22, 2022

img_map_placeholder

515 Delaware St SE, Minneapolis, MN


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.