BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 14, 2022 at 7:00 PM

Updated January 25, 2024

Site work and new construction of a mixed-use development in Saint-Leonard, Quebec. Completed plans call for site work for a playground / park / athletic field; and for the construction of a 10,000-square-foot, one-story above grade playground / park / athletic field.

Construction of permanent stages for the cultural scene in Wilfrid-Bastien Park including the “Place des generations” project. TIMELINE: The owner is implementing the project by construction packages. First construction package relating to civil engineering and landscaping work has been already tendered, awarded and is followed in the report under CRM ID name Development of a Generation Square at Wilfrid-Bastien Park. Construction started. Subsequent tender(s) is(are) anticipated in early/spring 2023 and will be followed in separate report(s).

Under Construction

Playgrounds / Parks / Athletic Fields

$2,250,000.00

Public - City

New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
366
Active Projects
137
Bidding Soon
2,679
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 15, 2022

Project location map

8255 Boulevard Lacordaire, Saint-Leonard, QC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.