BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 2, 2020 at 7:00 PM

Updated February 9, 2024

Renovation of a warehouse / distribution facility in Mobile, Alabama. Working plans call for the renovation of a warehouse / distribution facility.

A Bid Bond or Certified Check made payable to the Alabama State Port Authority and equal to five percent (5%) of the amount bid, not to exceed $10,000, must accompany the Bid Proposal Authority reserves the right to refuse to issue a proposal form or a contract to a prospective bidder for any of the following reasons: a) Failure to pay, or satisfactorily settle, all bills due for labor and materials on former contract in force with the Authority. b) Contractor default under previous Contract with the Authority. c) Proposal withdrawal or Bid Bond forfeiture on previous project with the Authority. d) Unsatisfactory work on previous contract with the Authority. e) Lack of competency, past experience, adequate machinery or lack of personnel Any questions regarding the procurement should be directed to Marcus Coleman, P.E., Project Manager, at phone number (251) 441-7260 or email mcoleman@asdd.com The right is reserved, as the interest of the Alabama State Port Authority may require, to reject any and all bids and to waive informalities in bids received. The Contractor must provide a high visibility temporary barrier to delineate the limits of construction activities on the piers at all times. The cost of all items ancillary to the project shall be absorbed into the cost of the bid items. No separate payment shall be made for these items. The work consists principally of providing bonds, labor, materials, equipment, insurance, and supervision necessary to remove and replace sections of damaged roof system as indicated in the contract documents. All materials, labor, tools, rigging and equipment necessary to perform the work shall be included by the Contractor in the proposal. It is the Contractor's responsibility to field verify all dimensions, quantities and site conditions essential for the successful completion of the work. It is the intent to follow the Scope of Work closely in all details, but it is understood that alterations may be required to conform to local conditions and that such alterations must be of the same character of construction as the existing roof system.

Final Planning

Warehouse / Distribution

$100,000.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
140
Active Projects
76
Bidding Soon
714
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 8, 2020

November 9, 2020

Project location map

To Be Determined, Mobile, AL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.