EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 9, 2021 at 8:00 PM

Updated October 1, 2024

Site work and paving for a mixed-use development in Keene, New Hampshire. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The proposed work shall include, but not be limited to the following: The installation of bicycle and pedestrian signage and 11,695 feet of shared lane and bike lane markings along West Street, Park Avenue and Summit Road. Improvements along West Street include reconstruction of some sidewalk ramps; Improvements to Ami Brown Road beginning at Skyline Drive and running to the Cheshire Rail Trail (approximately 3,400 ft.), including brush clearing, drainage, grading and a crushed stone dust surface; Upgrade of approximately 4,600 ft. of the existing Cheshire Rail Trail from Hurricane Road to Ami Brown Road including drainage, brush clearing, grading and crushed stone resurfacing; Installation of two trailhead sites including parking areas with grading, installation of a crushed stone surface and brush clearing/grubbing. One trailhead parking area is located near the intersection of Summit Ridge Drive and Summit Road and the other is located on Whitcombs Mill Road. This project is in the City of Keene the proposed work shall include, but not be limited to the following: o The installation of bicycle and pedestrian signage and 11,695 feet of shared lane and bike lane markings along West Street, Park Avenue and Summit Road. Improvements along West Street include reconstruction of some sidewalk ramps; o Improvements to Ami Brown Road beginning at Skyline Drive and running to the Cheshire Rail Trail (approximately 3,400 ft.), including brush clearing, drainage, grading and a crushed stone dust surface; o Upgrade of approximately 4,600 ft. of the existing Cheshire Rail Trail from Hurricane Road to Ami Brown Road including drainage, brush clearing, grading and crushed stone resurfacing; o Installation of two trailhead sites including parking areas with grading, installation of a crushed stone surface and brush clearing/grubbing. One trailhead parking area is located near the intersection of Summit Ridge Drive and Summit Road and the other is located on Whitcombs Mill Road

Bid Results

Roads / Highways

$449,796.00

Public - City

Paving, Site Work

35

10

3

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, Quality Assurance, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Execution, Application, Cleaning and Waste Management, Final Cleaning
Division 03 - Concrete

Division 03 - Concrete

Precast Concrete, Precast Structural Concrete
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Excavation, Backfill, Compaction
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Common Work Results for Exterior Improvements, Aggregates for Exterior Improvements, Bases, Ballasts, and Paving, Curbs and Gutters, Paving Specialties, Pavement Markings, Planting, Plants, Shrubs
Division 34 - Transportation

Division 34 - Transportation

Guideways/Railways, Rail Tracks

Find More Local Projects

Within 75 Miles of This Project
281
Active Projects
177
Bidding Soon
2,641
All Active Projects
1,164
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Cheshire Rail Trail III Loop Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.