BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of an educational facility in Montclair, California. Completed plans call for the construction of a educational facility; and for site work for a educational facility.

** As December 9, 2020 Project was awarded the following: Award of Bid and Contract C-201-268A, Project K036 with REY ART LANDSCAPE, INC., for the Serrano Middle School Wellness, Arts & Technology Center, Category 01 Landscape and Irrigation. Effective November 20, 2020 through December 20, 2021. Total cost not to exceed $136,800. Award of Bid and Contract C-201-268B, Project K036 with BOGH ENGINEERING, INC., for the Serrano Middle School Wellness, Arts & Technology Center, Category 02 Concrete & Earthwork . . Effective November 20, 2020 through December 20, 2021. Total cost not to exceed $1,835,900. Award of Bid and Contract C-201-268C, Project K036 with NEW DIMENSION MASONRY, INC., for the Serrano Middle School Wellness, Arts & Technology Center, Category 03 Masonry. Effective November 20, 2020 through December 20, 2021. Total cost not to exceed $866,440. AwardofBidandContractC-201-268D,ProjectK036with CANYONSTEELFABRICATORS,INC., for the Serrano Middle School Wellness, Arts & Technology Center, Category 04 Steel: Structural, Misc., Decking. Effective November 20, 2020 through December 20, 2021. Total cost not to exceed $1,043,999. Award of Bid and Contract C-201-268E, Project K036 with COMMERCIAL ROOFING SYSTEMS, INC., for the Serrano Middle School Wellness, Arts & Technology Center, Category 05 Roofing & Sheet Metal. Effective November 20, 2020 through December 20, 2021. Total cost not to exceed $596,429. Award of Bid and Contract C-201-268F, Project K036 with INLAND BUILDING CONSTRUCTION COMPANIES, INC., for the Serrano Middle School Wellness, Arts & Technology Center, Category 06 Doors, Frames & Hardware. Effective November 20, 2020 through December 20, 2021. Total cost not to exceed $142,800. Award of Bid and Contract C-201-268G, Project K036 with VELOCITY GLAZING, INC., for the Serrano Middle School Wellness, Arts & Technology Center, Category 07 Aluminum & Glazing. Effective November 20, 2020 through December 20, 2021. Total cost not to exceed $233,600. Award of Bid and Contract C-201-268H, Project K036 with CASTON, INC., for the Serrano Middle School Wellness, Arts & Technology Center, Category 08 Framing. Effective November 20, 2020 through December 20, 2021. Total cost not to exceed $485,585. Award of Bid and Contract C-201-2681, Project K036 with DONALD M HOOVER COMPANY for the Serrano Middle School Wellness, Arts & Technology Center, Category 09 Flooring & Wood Floor. Effective November 20, 2020 through December 20, 2021. Total cost not to exceed $314,710. Award of Bid and Contract C-201-268J, Project K036 with CRAMER PAINTING, INC., for the Serrano Middle School Wellness, Arts & Technology Center, Category 10 Painting. Effective November 20, 2020 through December 20, 2021. Total cost not to exceed $114,800. Award of Bid and Contract C-201-268K, Project K036 with W.D. GOTT CONSTRUCTION CO., for the Serrano Middle School Wellness, Arts & Technology Center, Category 11 General Package. Effective November 20, 2020 through December 20, 2021. Total cost not to exceed $894,000. Award of Bid and Contract C-201-268L, Project K036 with J.G. TATE FIRE PROTECTION SYSTEMS, INC., for the Serrano Middle School Wellness, Arts & Technology Center, Category 12 Fire Sprinklers Building. Effective November 20, 2020 through December 20, 2021. Total cost not to exceed $143,456. Award of Bid and Contract C-201-268M, Project K036 with RIVERA EQUIPMENT dba VALLEY INDUSTRIAL MECHANICAL for the Serrano Middle School Wellness, Arts & Technology Center, Category 13 Plumbing & Site Utilities. Effective November 20, 2020 through December 20, 2021. Total cost not to exceed $697,375. Award of Bid and Contract C-201-268N, Project K036 with FRANKLIN MECHANICAL for the Serrano Middle School Wellness, Arts & Technology Center, Category 14 HV AC. Effective November 20, 2020 through December 20, 2021. Total cost not to exceed $430,200. . Award of Bid and Contract C-201-268O, Project K036 with RYAN ELECTRIC, INC., for the Serrano Middle School Wellness, Arts & Technology Center, Category 15 Electrical & Low Voltage. Effective November 20, 2020 through December 20, 2021. Total cost not to exceed $1,043,000. For a more detailed discussion on Contract Time, Trade Contractor must refer to the General Conditions, Supplementary Conditions, Trade Contractor Scope of Work and General Requirements regarding Milestones and Liquidated Damages. Prequalification of Bidders As a condition of submitting a bid for this Project, and in accordance with California Public Contract Code section 20111.6, prospective bidders are required to submit to the District a completed set of prequalification documents on forms provided by the District. These documents will be the basis for determining which bidders are qualified to bid on this Project. The District is requiring that all Trade Contractors holding A, General Engineering, B, General Building License and all electrical, mechanical or plumbing contractors holding a C-4, C-7, C-10, C-16, C-20, C-34, C-36, C-38, C-42, C-43, or C-46 license bidding or subcontracting for District project must be pre-qualified by this District. Bids will not be accepted if a Trade Contractor has not been prequalified where prequalification is required. Prequalification documents are available from the Ontario-Montclair School District electronically and at 950 West D Street, Ontario, CA 91762, (909) 418-6473. Prequalification documents must be submitted by October 19, 2020. Such bidder's security must be in an amount not less than ten percent (10%) of the maximum amount of bid as a guarantee that the bidder will enter into the proposed Contract, if the same is awarded to such bidder, and will provide the required Performance and Payment Bonds, insurance certificates and any other required documents. Separate payment and performance bonds, each in an amount equal to 100% of the total Contract amount, are required, and shall be provided to the District prior to execution of the Contract and shall be in the form set forth in the Contract Documents. This is a courtesy reminder that all RFI's need to be submitted by October 15, 2020 @ 5 PM. Bid Result BC 01 - Landscaping & Irrigation (C27) Apparent low Rey Art Landscape, Inc :- $136,800.00 BC 02 - Concrete& Earthwork (A or C-8) Apparent low Bogh Engineering, Inc. :- $1,835,900.00 BC 03 - Masonry (C29) Apparent low Majestic Masonry Inc.:- $808,000.00 BC 04 - Steel: Structural, Misc., Decking (C51) Apparent low Canyon Steel Fabricators, Inc:- $1,043,999.00 BC 05 - Roofing & Sheet Metal (C39) Apparent low Commercial Roofing Systems, Inc :- $596,429.00 BC 06 - Doors, Frames & Hardware (C28 or D28) Apparent low Whitehead Construction, Inc :- $103,300.00 BC 07 - Aluminum & Glazing (C17) Apparent low Velocity Glazing, Inc.:- $233,600.00 BC 08 - Framing (C9 and C35) Apparent low Caston, Inc.:- $485,585.00 BC 09 - Flooring & Wood Floor (C15) Apparent low Donald M Hoover Company :- $314,710.00 BC 10 - Painting (C33) Apparent low Cramer Painting, Inc.:- $114,800.00 BC 11 - General Package (B) Apparent low W.D. Gott Construction Co:- $894,000.00 BC 12 - Fire Sprinklers Building (C16) Apparent low Rivera Equipment :- $697,375.00 BC 14 - HVAC (C20) Apparent low Franklin Mechanical:- $430,200.00 BC 15 -Electrical & Low Voltage (C10) Apparent low Ryan Electric, Inc:- $1,043,000.00

Under Construction

Educational

$8,979,094.00

Public - County

New Construction, Site Work

Subscribe For Documents

54 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
498
Active Projects
224
Bidding Soon
3,644
All Active Projects
1,595
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

October 29, 2020

November 20, 2020

December 20, 2021

img_map_placeholder

4725 San Jose St, Montclair, CA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.