BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 16, 2020 at 7:00 PM

Updated August 29, 2025

Site work and renovation of a water / sewer project in West Palm Beach, Florida. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

Project Description: Project includes but is not limited to; construction of the G-782 (Outflow) Pump Station Package which includes the construction of the pump station and portions of the Canals and Levees associated with the pump station. The construction also includes associated canals, levees, parking areas, access roadways, culverts, boat ramps, maintenance ramps, FPL Distribution and fiber optic duct banks, underground fiber optic link, and all other associated appurtenances shown or referenced within the Contract Documents. Directions: From North and South: From I-95 or Florida Turnpike, turn west onto Southern Boulevard, then turn left onto E. Canal Street South (CR880). Follow CR 880 for about 4-miles to the vicinity of structure G-341, then left (South) onto a dirt road (levee) for about 5.5-miles to the vicinity of pump station G-310. The site begins just west of the G-310 pump station and continues for 6-miles south just west of the L-7 levee for the project connection canal, and then another 3-miles south to the S-6 pump station for the STA area which lies between the L-7 and L-15 levees. Dollar Range: $34,000,000.00 - $37,600,000.00 Contract Time: 651 Days to Substantial Completion Contract Time: 711 Days to Final Completion Liquidated Damages: $4,500.00 per day, Substantial Completion Liquidated Damages: $2,400.00 per day, Final Completion Liquidated Damages: Pursuant to FDEP Consent Order $1,000.00 per day beyond December 31, 2022 SBE Requirements: 25% Utilization Direct all Inquiries in Writing to: Contract Specialist: Bonnie Cantrell Phone No. (561) 682-2521 E-Mail: bcantrel@sfwmd.gov Inquiries must reference Contract: 6000001142

Award

Water / Sewer

$37,418,195.00

Public - State/Provincial

Renovation, Site Work

581

55

67

12

Subscribe For Documents

150 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
256
Active Projects
118
Bidding Soon
1,841
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 4, 2020

January 4, 2021

Project location map

To Be Determined, West Palm Beach, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.