BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and outdoor lighting for a mixed-use development in Richland, Washington. Completed plans call for site work for a road / highway; for outdoor lighting for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

This project includes full reconstruction of Columbia Park Trail East for approximately 6000 linear feet from Fowler Drive and the Hanford Reach museum entrance road including removing the existing roadway (and old concrete highway), HMA surfacing, new curb & gutter, sidewalks, multi-use pathway, ADA ramp installation, storm drainage collection system, street light system, 3 controlled pedestrian crossing (RRFB systems), undergrounding of existing overhead power system, pavement markings, miscellaneous beautification and overall site restoration in Richland Washington. The City of Richland in accordance with Title VI of the Civil Rights Act of 1964, 78 Stat. 252, 42 U.S.C. 200d to 2000d-4 and Title 49, Code of Federal Regulations, Department of Transportation, subtitle A, Office of the Secretary, Part 21, nondiscrimination in federally assisted programs of the Department of Transportation issued pursuant to such Act, hereby notifies all bidders that it will affirmatively insure that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises as defined at 49 CFR Part 26 will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, national origin, or sex in consideration for an award. It is anticipated that this project will be funded in part by the Washington State Department of Ecology. Neither the State of Washington nor any of it departments or employees are, or shall be, a party to any contract or any subcontract resulting from this solicitation for bids. MBE: 5.4% WBE: 6.9% All questions related to this project must be submitted by close of business Wednesday, October 21, 2020.

Award

Roads / Highways

$4,405,205.00

Public - City

Outdoor Lighting, Paving, Site Work

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
18
Active Projects
8
Bidding Soon
131
All Active Projects
51
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 26, 2020

March 1, 2021

img_map_placeholder

Columbia Park Trail, Richland, WA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.