BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a mixed-use development in Maple Grove, Minnesota. Completed plans call for site work for a municipal facility; and water / sewer project.

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section. B. The work included under Division 26 and 27 shall consist of furnishing labor and materials necessary for the complete installation of electrical systems shown on the Contract Drawings and Specifications. Work shall be complete and in operating condition at the completion of Contract. C. Include minor items which are obviously and reasonable necessary to complete the installation and usually included in similar work even though not specifically mentioned in the Contract Documents. D. Deviations due to particular manufacturers requirements shall be provided at no additional cost to the Owner. E. Where material quantities are shown, they are for the convenience of the Contractor only. The Contractor shall be responsible to verify quantities. F. Coordinate with the mechanical and general contractors for coordination drawings for all disciplines. Coordination drawings shall include plan view and elevations. G. Coordinate with general contractor and low voltage contractor as to low voltage systems to be removed and/or replaced with project phasing. H. Coordinate with structural for penetration through structural members. Exposed conduit on ceiling is not acceptable. I. The model numbers and series of the equipment (where mentioned) are current at the time the contract documents were prepared. Some of the model numbers or series/lines may be end-of-life or obsolete at the time submittals are created or when equipment is ordered for installation. Verify model numbers and software/firmware prior to ordering the equipment to review the status of the models. Provide current model equipment and software providing equivalent or better performance and features at no additional cost to the Owner.

Bid Results

Water / Sewer

$328,519.00

Public - County

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
122
Active Projects
85
Bidding Soon
802
All Active Projects
329
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 20, 2020

November 19, 2020

img_map_placeholder

8751 Jefferson Hwy, Maple Grove, MN

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.