BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 13, 2023 at 8:00 PM

Updated January 26, 2024

Renovation of a mixed-use development in Libertyville, Illinois. Completed plans call for the renovation of a development; and warehouse / distribution facility.

Remove existing VCT flooring and clean and prep floors and walls (reinforce cracks) to receive a new epoxy floor and integral epoxy cove base. All drains must be reinforced per specs. Install the new epoxy flooring and base per specs and once done, cleanup work area. If any prospective Vendor is in doubt as to the true meaning of any part of the RFQ Package, such prospective Vendor shall submit to Owner an email directed to Owner's Purchasing Department, purchasingdept@LCFPD.org, for an interpretation thereof not later than 11:00 a.m. local time on October 14, 2020.

Award

Conservation and Development

$16,500.00

Public - County

Renovation

7

5

9

6

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
527
Active Projects
289
Bidding Soon
3,799
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 22, 2020

November 23, 2020

Project location map

28285 N St Marys Rd, Libertyville, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.