BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and renovation of a civil project in Austin, Texas. Working plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

As of April 1, 2022, the owner has selected a Construction Manager for this project. A timeline for construction is not available at this time. The Lower Colorado River Authority (LCRA) is looking to pre-qualify contractors for the Wirtz Dam Floodgates Ph II Construction Manager at Risk (CMAR) project. LCRA is a conservation and reclamation district created by the Texas Legislature in 1934. It has no taxing authority and operates solely on utility revenues and fees generated from supplying energy, water and community services. In CMAR, the owner retains a design engineer and a CMAR firm under separate contracts. The design engineer designs the project while the CMAR firm provides construction-related advice during design development and acts as general contractor if the owner and CMAR firm can agree to a Guaranteed Maximum Price (GMP) Anticipated Release Date for RFP November 16, 2020 Anticipated Contract Award Date April 08, 2021 Anticipated Project Construction Start Date March 2022 Project Introduction LCRA currently plans to replace and/or refurbish the Wirtz Dam tainter gates and gate hoist bridges to address corrosion issues and structural deficiencies with respect to modern tainter gate design. The project is organized into two Phases: Phase 1 - Preparation of a Phase 1 Engineering Report Phase 2 - Replacement/refurbishment of Wirtz Dam floodgates and gate hoist bridges LCRA has completed Phase 1 of this project. Based on the Phase 1 report, LCRA decided to replace all 10 tainter gates (Gates 1 through 10) and 9 hoist bridges (for Gates 2 through 10). (Note: based on further investigation, Gate 1 and the hoist bridges for Gates 2 through 10 have the potential to be upgraded/refurbished.) LCRA has chosen the Construction Management at Risk (CMAR) delivery method for this project. All contractors who meet the requirements of this Pre-Qualification as described in Sections 2 and 3 below will receive and be allowed to participate in the RFP that is to follow. Firms that do not meet the Pre-Qualification requirements will not be eligible to participate in the RFP process. Any questions during this process shall be directed to Gabriela Harthcock at gabriela.harthcock@lcra.org or Laura Guillory at laura.guillory@lcra.org. Any direct communication with other LCRA staff or Board Members may result in the disqualification of your Pre-Qualification and negate your ability to participate in the RFP. Project Location Wirtz Dam is located on the Colorado River in Llano and Burnet Counties near the city of Marble Falls, Texas, 387 miles upstream from the Gulf of Mexico and about 45 miles northwest of Austin. The dam construction was begun in 1949 and completed in 1950.

Pre-Construction/Negotiated

Water / Sewer

$1,271,700.00

Public - State/Provincial

Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
274
Active Projects
120
Bidding Soon
3,574
All Active Projects
1,376
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

October 20, 2020

May 2, 2022

img_map_placeholder

To Be Determined, Austin, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.