BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Greenville, North Carolina. Completed plans call for site work for a water / sewer project.

Bids for the construction of the Greenville Utilities Commission Outfall Sewer Rehabilitation Phase IV will be received by the Owner. Contractors are notified that North Carolina G.S. 87 relating to licensing of contractors will be observed in receiving bids and awarding contracts. Representatives of Owner and Engineer will be present to discuss the Project. Engineer will transmit to all prospective Bidders of record such Addenda as Engineer considers necessary in response to questions arising at the conference. Oral statements may not be relied upon and will not be binding or legally effective. The work includes the Cured-in-Place (CIPP) pipe rehabilitation of 660 lf of 21-inch, 6,885 lf of 24-inch, and 795 lf of 27-inch sewer outfall along portions of the Green Mill Run and Tar River Sewer Outfalls; rehabilitation of the corresponding 37 manholes using the Epoxy lining method; contingency CIPP rehabilitation of 905 lf of 24-inch; contingency rehabilitation of up to four manholes using the Epoxy lining method; up to six total contingency point repairs in each of the 21-, 24-, and 27 diameter ranges; contingency joint testing and grouting; contingency construction matting; and all tasks necessary to deliver the finished product for service and shall, at minimum, include site access, CSX coordination, pre-and post-cleaning and television inspection, by-pass pumping/flow control, required testing, and restoration of all areas disturbed by the contractor.

Award

Water / Sewer

$2,624,220.00

Public - City

Site Work

39

1

8

12

Subscribe For Documents

39 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
115
Active Projects
53
Bidding Soon
1,117
All Active Projects
461
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

December 3, 2020

February 15, 2021

img_map_placeholder

3355 NC-43, Greenville, NC

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.