Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a mixed-use development in Mukilteo, Washington. Design plans call for site work for a road / highway; and for paving for a road / highway.
As of February, 2022, an engineer has been selected and this project is in design phase. A firm timeline for construction has not been determined. Further details and final design from the City of Mukilteo are expected to be released in Spring, 2022. *The closed solicitation has been included below for reference: City Seeks Public Input on Future of 5th Street, Grant-Funded Project will Design New Walking and Biking Improvements City Seeks Public Input on Future of 5th Street Grant-Funded Project will Design New Walking and Biking Improvements The City of Mukilteo is planning significant investments for 5th Street and wants to hear from community members to help shape the project. The City is looking at a range of improvements on 5th Street from Lincoln Avenue to the Everett city limit, which will benefit people walking, rolling, biking, driving, and using public transit in Old Town Mukilteo. With the aid of the community, the project will begin with identifying preferred options along the corridor to provide safe and comfortable solutions for people traveling along 5th Street. "This grant-funded effort is a great opportunity to serve all users of this main entrance to Mukilteo and a vibrant neighborhood ," said Mayor Jennifer Gregerson. "It is a key city priority to have safe places to walk and bike, and we want to hear our residents' voices on how to best do that on 5th Street." Share your thoughts to shape the outcome of the street design by taking the City's online survey now through July 9th. Take the survey by visiting: https://mukilteowa.gov/5th-st-ped-bicycle-improvements/. This project builds off past City planning efforts and community requests for traffic calming and accessibility investments for a wide range of users along 5th Street. This project will be evaluating a wide range of options, including a shared use path within the Old Town segment of 5th Street from Lincoln Avenue to the Japanese Gulch area, striping for bike lanes between the Japanese Gulch area to the Everett city limits and installation of crosswalks with flashing beacons. Design based on the preferred options is expected to be completed by Summer 2022. "The purposes of this project are to support more walking and biking, improve connections to businesses, enhance and complement the character of the Old Town neighborhood, and to make sure we are protecting our water quality and managing water runoff," said Mayor Gregerson. Public input is important to ensure the design of the 5th Street improvements reflect the current and future needs of the community. If you are interested in sharing feedback please take the survey or submit a comment to the City Project Manager, Connie Bowers, PE at cbowers@mukilteowa.gov. Stay in the loop about project updates, surveys, and updates, surveys, availability of new documents, and scheduled meetings by visiting our website at: https://mukilteowa.gov/5th-st-ped-bicycle-improvements/ or emailing cbowers@mukilteowa.gov to be included on the project email list. ______________ The City of Mukilteo is requesting qualifications (RFQ) from qualified professionals or firms to provide professional services for the public outreach, design, engineering and permitting of the 5th Street Bicycle & Pedestrian Project, with the option for grant application support and / or construction management and inspection services. The project will provide pedestrians and bicyclists new intuitive access modes on 5th St / Mukilteo Blvd. The consultant will be expected to work with the public to refine a design approach, obtain permits, and prepare contract plans, specifications, and estimates (PS&E) of the proposed improvements. This project will be designed using Sound Transit Access grant funding. It is likely that Sound Transit Access grant funds will be used for construction. Email attachments shall include: a cover letter that briefly describes your interest in the project (limited to one page, minimum 10-point font); the firms expected approach to the project (limited to 2 pages, minimum 10-point font); a list, with a short description, of at least three projects which closely relate to the above described project, including references (limited to 3 pages, minimum 10-point font); key personnel expected to be assigned to this project; availability, resumes, and references (limited to 4 pages, minimum 10-point font) For your records, the City will provide a confirmation email confirming receipt of your interest in the proposal. The City of Mukilteo reserves the right to reject any and all responses to this RFQ and to waive any informality in the interests of the City. The method of Contractor Selection has not been Determined at this time.
Design
Sidewalks / Parking Lot
$2,900,000.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 4, 2022
5th St, Mukilteo, WA
Related To This Project
Mukilteo, WA
Bid Date: May 19 2022
Mukilteo, WA
Bid Date: May 17 2022
Mukilteo, WA
Bid Date: Jun 16 2022
Mukilteo, WA
Bid Date: Aug 04 2022
Mukilteo, WA
Bid Date: Jun 29 2022
Mukilteo, WA
Bid Date: Aug 31 2022
Mukilteo, WA
Bid Date: Aug 04 2021
Mukilteo, WA
--
Waterville, WA
Bid Date: Mar 14 2022
Bainbridge Island, WA
--
Airway Heights, WA
Bid Date: Mar 29 2022
Forks, WA
Bid Date: Apr 05 2021
Pomeroy, WA
--
Seattle, WA
Bid Date: Jun 02 2020
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.